My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REVISION - 5/22/2009, 7:55:28 AM-MR1
DRMS
>
Public
>
REVISION - 5/22/2009, 7:55:28 AM-MR1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 11:34:56 AM
Creation date
5/22/2009 8:23:05 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2008046
IBM Index Class Name
REVISION
Doc Date
5/21/2009
Doc Name
New MD application (MD-02) Non-confidential Part 1
From
American Shale Oil, LLC
To
DRMS
Type & Sequence
MD2
Email Name
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MODIFICATION 03-2009 <br />Exhibit C - AMSO, LLC Notice of Intent Supplemental Information <br />The following information is presented in accordance with the requirements set <br />forth in the NOI application Section III, G.A., G.B., and G.C. and the Drilling Plan <br />required by BLM for the Application for Permit to Drill or Reenter. <br />Well CH-1 was constructed on drill pad TP in accordance with the approved NOI. Upon <br />completion of drilling and downhole geophysical logging, the well was plugged and <br />abandoned in accordance with the approved NOl. Modifications to the drilling program <br />for the remaining wells to be completed under Phase I are as follows: <br />• Installation of one new exploration borehole, referred to herein as "BH-1", on <br />drill pad TM <br />• Relocation of the 4 tomography wells specified in the approved NOI from drill <br />pad TP to drill pad TM <br />• Deletion of well TM'i 1 from drill pad TP and well HB-1 from drill pad HB <br />• Design changes for the typical tomography well (wells TM-1 through TM-4), <br />monitoring well HB-L3, Wasatch monitoring well MWP-2 WS, B-Groove <br />monitoring well MWP-2 BG, and L3 monitoring well MWP-2 L3 <br />Locations for the plugged and abandoned corehole CH-1 and the remaining Phase I wells <br />are shown in Modification 03-2009 Exhibit A (Figures A.2 and A.3). The Phase I well <br />program, as modified under the modification, are summarized in Table C.1. <br />• <br />4
The URL can be used to link to this page
Your browser does not support the video tag.