Laserfiche WebLink
SNOWCAP COAL COMPANY <br />PHASE III BOND RELEASE <br />OVERLAND CONVEYOR - SL-5 <br />DIRECT COST SUMMARY <br />DRMS DRMS <br />TASK # TASK HRS <br />DESCRIPTION <br />TOTAL <br />JOB COST (DRMS Est) <br />005 0.27 Backfill and Regrade Railroad Spur Area (See Note 1) $213.10 <br />102 2.16 Replace topsoil from stockpile to Overland Conveyor Area (See Note 1627.50 <br />103 0.13 Replace topsoil from stockpile to Railroad Spur Area (See Note 1) $99.24 <br />130 4.23 Drill Seed Lowland Seed Mix on Conveyor Corridor (See Note 3) $2,798.40 <br />135 Remove Railroad Track (See Note 1) $3,156.05 <br />135 Remove Ballast (See Note 1) $176.77 <br />TOTAL 6.80 $8,071.06 <br />Note 1: Task 5, 103 & 135 - Based on 5% task <br />450' rail removed/9885' total rail in place = 5% <br />Task 135 adjusted by 99.2% based on Location Adjustment <br />Note 2: Task 102 - Based on 41% of total reclaimed Overland Conveyor Area. <br />Total overland conveyor area of 4.34 acres/overland conveyor area in release of 1.76 acres = 41% <br />Note 3: Task 130 - Based on 2.1 acres reseeded in release area.