<br />6872 .307 1.711 <br />6873 .354 2.041 <br />6874 .4488 2.441 To of embankment <br />The maximum sediment storage that will occur over three years is 0.009 ac-ft. With a three year sediment <br />accumulation, the base elevation for water storage will have increased from 6862.0 ft amsl to 6862.32 ft <br />amsl. The SEDCAD model accounts for the maximum sediment storage volume by recalculating the <br />elevation-area-capacity table to show 0.000 ac ft capacity at the maximum sediment storage elevation. <br />The following pond elevation-area-capacity data were input into SEDCAD for Pond 2 (Table 4): <br />Table 4. Pond 2 Elevation-Area-Capacity <br />L? <br />Elevation (ft amsl) Area (ac) Capacity (ac-ft) References <br />6846.5 0.013 0.000 Bottom of and <br />6847 0.025 0.009 <br />6848 0.051 0.047 <br />6849 0.080 0.111 <br />6850 0.106 0.204 <br />6851 0.133 0.323 <br />6852 0.159 0.469 <br />6853 0.185 0.641 <br />6854 0.212 0.839 Emergency spillway <br />6855 0.241 1.066 <br />6855.5 0.256 1.190 To of embankment <br />Because Pond 2 will only be operational during the construction of the intake shaft installation, the <br />SEDCAD elevation-area-capacity table was not redefined based on sediment storage capacity for three <br />years. <br />Following is a list of SEDCAD runs that were completed to support this design. Supporting <br />documentation for the SEDCAD runs is provided in the four attached SEDCAD reports. <br />10-year, 24-hour Shaft Pad During Construction - Pond 1 is assumed to contain three years of <br />accumulated stored sediment and has a starting initial pool elevation at the invert of the principal <br />spillway. Pond 2 has a starting initial pool elevation at the invert of the emergency spillway. This <br />analysis was completed to show that given these conditions, discharge from Pond 2 will meet NPDES <br />requirements for water quality. Requirements include that the peak total suspended solids (TSS) <br />concentration not exceed 70 mg/l and that the peak settleable solids (SS) concentration never exceed 0.5 <br />ml/l. From the SEDCAD model, TSS in runoff entering Pond 1 is estimated at 5,920 mg/1. Outflow <br />concentrations from Pond 1 are 535 mg/1. Because Pond 2 receives runoff from additional areas as well <br />as the outflow from Pond 1, the SEDCAD results indicate that runoff entering Pond 2 has an estimated <br />peak TSS concentration of 1,347 mg/l, and an outflow concentration of 62 mg/l. Settleable solids <br />concentrations entering the ponds never exceed the 0.5 ml/l requirement: the SEDCAD results show <br />inflows to Pond 1 having a maximum SS value of 0.3 ml/l and inflows to Pond 2 having a maximum SS <br />concentration of 0.32 ml/l. Outflow SS concentrations for both ponds are zero. <br />Twentytmile Coal Company 18L Shaft Pad <br />Drainage and Sediment Control System Design <br />Water & Earth Technologies, Inc. <br />March 2, 2009