Laserfiche WebLink
used for a period of more than 6 months shall utilize culverts <br />arri bridges designed to safely pass the 10-year, 24-hour ~' <br />precipitation event or longer as specified by the Division. <br />Ditches, cross drains, road surface drainage culverts, aryl <br />ditch relief drains will be installed as required by the <br />Division to control erosion for light-use roads. <br />Natural Drainage. Natural~innel drainageways will not be <br />altered or relocated for the puzpsoes of light-use road <br />con~.vction. <br />Stream Crossings. Drainage strtrcttn-es requried for crossing <br />streams will no affect the normal flow or gradient of the <br />stream, adversely affect the fish migration and aquatic <br />habitat ar' related envisnrnre~rtal values. <br />4.03.2(7) Reclamation. Peabody will reclaim a light-use road when it is • <br />no longer needed in aooardance with the reclamation plan. Tkre <br />road will be closed to vehicular traffic. ire natural <br />drainage patterns will be restored. All culverts will be <br />removed. Roadbeds will be ripped, plowed or scarified. Cut <br />and fill slopes will be rauried or reshaped and blended into <br />the srn7ourrding topography. Cross drains, dikes or water bars <br />may be constructed to control erosion as *~ ' ed. Road <br />surfaces frcaa which topsoil has been removed will be covered with <br />topsoil aryl revegetated in aowrdanoe with the reclamation plan. <br />2.05.3(4) SIDII+IINP PONDS <br />See F~ibits 7-7 to 7-17 for details. <br />2.05.3(5) `ibFSOIL REMOVAL AND S'II~RAGE <br />The Seneca II soils have been evaluated and categorized by the <br />U.S. Soil Conservation Service, by Teams IrLStxwnPnts • <br />Ecological Services Division, by Claude L. Fly aryl Associates, <br />12-37n Revised 12/10/92 <br />