Laserfiche WebLink
ROADABLE EQUIPMENT sheet 2 of 2 <br />Machine <br />Description Total <br />Cost/hour/unit Fleet Size <br />(No. units) Haul Trip <br />Cost/hr/fleet Return Trip <br />Cost/hr/fleet <br />-Fuel Tanker, 42, 170 HP $63.62 1 $63.62 $63.62 <br />-Lube Truck, 4x2, 170 HP $71.52 1 $71.52 $71.52 <br />-Light Duty Pickup, 44, 314 T. $33.43 1 $33.43 $33.43 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotals : $168.56 $168.56 <br />EQUIPMENT HAUL DISTANCE and TIME <br /> Nearest major city or town within project area region : Granby <br />Transportation Cycle Time : Non- Total one-way travel distance : 5.0 miles <br /> Roadable Roadable Average travel speed : 35.0 mph <br /> Equipment Equipment <br />Haul time (hours) = 0.14 0.14 Total non-roadable mob/demob cost $10,276.22 <br />Return time (hours) = 0.14 0.14 ` two round trips with haul rig T <br />Loading time (hours) = 0.50 NA Total roadable mob/demob cost ** : $48.16 <br />Unloading time (hours) = 0.50 NA *• one round trip, no haul rig <br />Subtotals = 1.29 0.29 <br /> <br />JOB TIME AND COST Total job time : 2.57 hours <br /> Total job cost : $10,324