My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-05-13_REVISION - M1983102
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1983102
>
2009-05-13_REVISION - M1983102
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 11:44:24 AM
Creation date
5/15/2009 7:52:01 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1983102
IBM Index Class Name
REVISION
Doc Date
5/13/2009
Doc Name
FW increase
From
DRMS
To
Reclamation Ridge, LLC
Type & Sequence
SI2
Email Name
PSH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />EQUIPMENT MOBILIZATION / DEMOBILIZATION <br />PROJECT IDENTIFICATION sheet 1 of 2 <br />Agency or organization name : Colorado Department Of Reclamation, Mining And Safety <br />Task # : 006 State : Colorado Permit/job #: PR <br />Date : 0511112009 County :Grand Abbreviation :none <br />User : PSH Site : Thompson Resource Filename :PPR-006 <br />Permit or other job action : So-02 Revised Bond Calculation <br />Task description : Mob/Demob <br />EQUIPMENT TRANSPORT RIG COST Shift basis : 1 per day <br />Cost data source : CRG Data <br />Truck tractor description : Generic on-highway truck tractor, 6x4, diesel powered, 400 HP (2nd half, 2006) <br />Truck trailer description :Generic folding gooseneck, drop deck equipment trailer (25T, 50T, and 100T) <br />Available rig capacities : 0-25 Tons 26-50 Tons 51+ Tons <br />Cost Breakdown : Ownership cost/hour : $16.63 $18.37 $22:33 <br />Operating cost/hour : $44.38 $46.13 $50.07 <br />Operator cost/hour : $27.66 $27.66 $27.66 <br />Helper cost/hour : $0.00 $25.39 $25.39 <br />Total Unit Cost/hour : $88.67 $117.55 $125.45 <br />NON-ROADABLE EQUIPMENT <br />Machine <br />Description Weight/unit <br />(Tons) Ownership <br />Cost/hr/unit Haul Rig <br />Cost/hr/unit Fleet Size <br />(No. units) Haul Trip <br />Cost/hr/fleet Return Trip <br />Cost/hr/fleet DOT permit <br />Cost/fleet <br />-Cat D8R Series !I - 8SU (20 51.68 $50.32 $125.45 3 $527.30 $376.35 $1,500.00 <br />-CAT 140H 14.94 $27.95 $88.67 1 $116.62 $88.67 $500.00 <br />-Cat 631G 51.23 $78.78 $125.45 2 $408.47 $250.90 $1,000.00 <br />-Hydroseeding 50.00 $50.00 $117.55 2 $335.10 $235.10 $0.00 <br />-Revegetation 50.00 $50.00 $117.55 2 $335.10 $235.10 $0.00 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotals : $1,722.58 $1,186.12 $3,000.00
The URL can be used to link to this page
Your browser does not support the video tag.