Laserfiche WebLink
As of March 31, 2009, the Division estimates liability at the Edna Mine is $3,034,102. This <br />amount is sufficient to assure completion of the remaining reclamation work at the site if the <br />work had to be performed by the Division, including the cost of re-establishing vegetation on any <br />revegetated areas, should those areas fail. The permittee currently has on deposit with the <br />Division a self bond in the amount of $3,071,961. There is adequate bond on deposit. <br />Edna Mine -5- 4/15/2009