Laserfiche WebLink
Table D-3 <br />&Ktwx?rr_ mnNNAf_F. PF.R AREA <br />Phase Acres <br />(Mined) Tons Gravel Gravel Life <br />(years) Exposed <br />Area <br />Acres/Year <br />1 5.54 225,247 1 5.54 <br />2. 5.54 225,247 1 5.54 <br />3 5.54 225,247 1 5.54 <br />3. Mining Timetable <br />Mining operations would begin in late summer of 2009, provided that all permits are <br />granted. Mining would last approximately 10 years, although the market plays a large <br />role in the length of the mining. Rio Blanco County Company expects the average <br />production from the pit is 48,900 tons per year. <br />4 Facilities and Equipment <br />The site may contain: <br />A portable screening/washing plant with a 500 gallon diesel tank <br />A portable Asphalt plant with a 250 gallon diesel tank <br />A portable Concrete plant with a 500 gallon diesel tank <br />Portable Scales <br />A portable office trailer <br />A portable crusher with a 2,000 gallon diesel tank <br />A fuel farm with a 10,000 gallon diesel tank <br />A portable QC lab trailer <br />A small portable shop trailer <br />Mobile equipment which will be used on site over the mine life: <br />1 or 2 Front end loaders <br />1 or 2 Bulldozers <br />1 Motor Grader <br />1 Scrapper <br />Track hoe <br />1 Water truck <br />1 Fueling Truck <br />Several off-road haul trucks <br />Various 24 ton and 14 ton road haul trucks as necessary to move the permitted <br />product to market <br />9