My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-05-05_PERMIT FILE - M2009038
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2009038
>
2009-05-05_PERMIT FILE - M2009038
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:46:12 PM
Creation date
5/14/2009 8:48:26 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2009038
IBM Index Class Name
PERMIT FILE
Doc Date
5/5/2009
Doc Name
New 112c application
From
Urie Rock Company
To
DRMS
Email Name
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The anticipated future average total tonnage sold from the site in any one calendar year is <br />48,900 tons. Table D-1 shows a breakdown of the expected average annual production. <br />Table D-1 <br />AVERAGE ANNUAL PRODUCTION DISTRIBUTION <br />Product Tons Sold % Rejection Rate <br />(Naturals) Tons Mined <br />Road Base 135,000 0% 135,000 <br />Concrete 25,000 10% 27,500 <br />As halt 25,000 40% 35,000 <br />Pit Run 15,000 0% 15,000 <br />Washed Aggregate <br />Total 25,000 <br />225,000 10% <br />7% 27,500, <br />240,000 <br />The total permit area is 30.48 acres. A breakdown of the estimated areas is shown in <br />Table D-2. <br />Table D-2 <br />PERMIT AREA ACREAGES <br />Phase 1 5.54 Acres <br />phase 2 5.54 Acres <br />Phase 3 5.54 Acres <br />Office, Scales, and Parkin 3.00 Acres <br />Overburden and Topsoil stockpiles 10.86 Acres <br />Total 30.48 Acres <br />Roads will be constructed, upgraded and maintained with road base and will be <br />compacted if necessary. A water truck will be used to control dust on road during <br />operation. <br />Mining will progress starting with Phase 1 and then move to Phase 2 and finally to Phase <br />3. All Phases will proceed from East to West. As the mining proceeds the overburden is <br />replaced in the previously mined areas to reclaim the area. By using this method only a <br />portion of the total pit boundary is exposed at a time. Table D-3 shows the phase <br />tonnages, life and exposed area per year of each phase based upon the 225,000 tons per <br />year production (240,000 tons mined). <br />s
The URL can be used to link to this page
Your browser does not support the video tag.