My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMIT FILE - 5/13/2009, 10:33:42 AM-MR1
DRMS
>
Public
>
PERMIT FILE - 5/13/2009, 10:33:42 AM-MR1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:28:31 PM
Creation date
5/13/2009 10:38:08 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2009013
IBM Index Class Name
PERMIT FILE
Doc Date
4/28/2009
Doc Name
New NOI application (non-confidential)
From
Shell Frontier Oil & Gas, Inc.
To
DRMS
Email Name
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6 (Form 2- Public) <br />3. Describe the estimated topsoil depth and how topsoil will be salvaged, stockpiled and redistributed for the re-establishment of <br />vegetation. Specify approximate topsoil redistribution depth: <br />The proposed work area is situated on an existing mine bench with no topsoil. However, volunteer plant <br />growth within the proposed work area indicates that surficial material will be suitable for plant growth. An <br />avg. 6 inches of suitable plant growth material will be stripped from the surface to the active work area <br />around the shaft and stockpiled for use during reclamation. Stockpiles will be covered with erosion control <br />material. Once project work is completed, disturbed areas will be graded and ripped to a depth of 12 inches. <br />Stockpiled plant growth material will then be spread evenly over regraded areas followed by revegetation. <br />Woody vegetation removed during site construction will be evenly redistributed over revegetated areas. <br />4. Describe how drill holes will be plugged (refer to Rule 5.4 of the Rules for required abandonment procedures): <br />NA - No borehole plugging and abandonment work will be required for this project. <br />5. Describe how portals, edits, shafts, ponds, excavations, or other disturbances will be reclaimed (refer to Rule 3 and Rule 5 for <br />specific reclamation performance standards). You may wish to contact the Division for closure specifications. <br />Please see attached page 11 for description under Heading IV - Operations and Reclamation, subheading 5. <br />6. Describe how roads will be reclaimed or returned to their pre-prospecting (or better) condition <br />Please see attached page 12 for description under Heading IV - Operations and Reclamation, subheading 6.
The URL can be used to link to this page
Your browser does not support the video tag.