Laserfiche WebLink
IV. ENFORCEMENT ACTIONS <br /> The following identifies enforcement actions taken during this inspection, the required abatement and date of <br /> abatement for the violation, previous violations still requiring abatement and the termination of violations cited <br /> during previous inspections. <br /> NOV CV-2009-002 Abatement <br /> On or before June 1, 2009: <br /> Regrade gullied ditch segment adjacent to Scotchman's Gulch road fill, install riprap or adequate TRM liner in <br /> the channel to control erosion in accordance with regulations and permit requirements, reseed areas disturbed <br /> by erosion repair and area of sediment deposition between toe of fill on east side of road and south bank of <br /> Scotchman's Gulch channel, and install additional temporary erosion control measures such as straw wattles or <br /> silt fencing to minimize further sediment deposition from the fill vicinity into Scotchman's Gulch channel. <br /> NOTE: Attach appropriate VIOLATIONS or CESSATION ORDER CODING FORMS <br /> Revised 2/97 <br /> 6 <br />