Laserfiche WebLink
amec <br />Earth 8 Environmental <br />VLF EARTHWORKS FIELD MONITORING SUMMARY (WEEKLY REPORT) <br />Project Title: CC&V/ Phase 5 <br />Owner: Cripple Creek & Victor Gold Mining Co. <br />Location: Cripple Creek & Victor Gold Mine <br />Work Element: Phase 5 CQA/ VLF <br />Date: May 2, 2009 <br />Project No.: 84201125EO <br />Contractor: Ames Construction Co., Inc. <br />Shift: Day/Night <br />Reporting Period: 04/26/09 through 05/02/09 <br />Days S M T W T F S <br />Work Shifts D D D D D D <br /> - N N N N N N <br />D = Day Shift N = Night Shift <br />Ambient Temperature Range (F): Low: 27°F to 36°F (+/-) High: 48° F to 60° F <br />AMEC CQA: Personnel On-site through the Reporting Period (See Attachment A). <br />AMES: No delays due to weather during the week. <br />CONSTRUCTION ACTIVITIES and PROGRESS: <br />II) EARTHWORKS <br />A) Clear and Grubbing <br />1) VLF <br />No work performed during the week. <br />2) VLF, PSSA Haul Road <br />No work performed during the week. <br />B) Stripping <br />1) VLF <br />No work performed during the week. <br />2) VLF, PSSA Haul Road <br />No work performed during the week. <br />C) Waste Rock to Stockpile: <br />1) VLF <br />No work performed during the week. <br />2) VLF, PSSA Haul Road <br />No work performed during the week. <br />Sheet I of 6 <br />VLF Weekly Report WE 05.02.09.D.doc