My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-04-29_REVISION - M1980146
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980146
>
2009-04-29_REVISION - M1980146
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:44:12 PM
Creation date
5/6/2009 2:05:39 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980146
IBM Index Class Name
REVISION
Doc Date
4/29/2009
Doc Name
New amendment application AM-04
From
C&J Gravel Products, Inc.
To
DRMS
Type & Sequence
AM4
Email Name
RCO
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
128
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Reclamation Permit Amendment Application (M-1980-146: AM-04) -112c Page 10 of 27 <br />M western edge of these three areas will contain soil for reclamation after use of areas for <br />plants and product/overburden stockpiles is done. <br />4. Areas A-C, E, and F will be addressed as explained in Sheet F-1. <br />c. Sheet F-3: (Reclamation Contours, Phase I: if additional BLM is not leased) <br />1. Perimeter highwalls ranging from 20 to 80 feet in height will have slopes of 65% <br />(approximately 1.5:1) to 2:1. <br />2. Pit floor will be relatively level, with the northern 40% draining to the west, and <br />the remainder to the south. <br />3. The exact height of the sloped/backfilled south highwall (Areas H, 1) will be <br />determined by the relative elevation of the Crader Pit to the south and the Montoya Pit. <br />4. The south area (Area L) will include a small settling and infiltration basin to <br />control sediment and provide for better vegetation. <br />5. A BLM access road and bike trails would criss-cross the area but are not shown, <br />as the exactly location is undetermined by BLM at this time. <br />d. Sheet F-4: (Reclamation Sequence, Phase II: if additional BLM leases are granted) <br />1. Area I will be reclaimed after M, N, O, and P, unless BLM authorizes and <br />requires a permanent access road be left through these areas. <br />2. Areas J, K, and much of L will have all slopes done, but the floor will be left <br />without soil until no longer needed for plant and stockpile areas, then will be <br />reclaimed. <br />3. Reclamation for Area Q will be shown only in a technical revision, if approved by <br />BLM. <br />• e. Sheet F-5: (Reclamation Contours, Phase 11: if additional BLM leases are granted) <br />8. All perimeter highwalls ranging from 20 to 80 feet in height will have slopes of <br />65% (approximately 1.5:1) to 2:1. <br />9. Pit floor will be relatively level, with the western % draining east then south (some <br />of this area may have internal drainage and infiltration, only), the northcentral'/ draining <br />to the southwest (same as western %), and the south half to the south. <br />10. The exact height of the sloped/backfilled south highwall (Areas H, 1) will be <br />determined by the relative elevation of the Crader Pit to the south and the Montoya Pit. <br />Other heights dictated by terrain and BLM requirements. <br />11. The south area (Area L) will include a small settling and infiltration basin to <br />control sediment and provide for better vegetation. Area M will also have a similar basin. <br />12. A BLM access road and bike trails would cross the entire area but are not shown, <br />as the exactly location is undetermined by BLM at this time. <br />• <br />8. See Exhibit F for reclamation maps. <br />9. See also Bureau of Land Management Environmental Assessment "Grandview Gravel Pit <br />Expansion Project" Attachment M-1. (Section 1.2 Description of Proposed Action) <br />10. Notes for Tables: Reclamation tasks (in order): backfill to final elevations (BF), finish <br />grading (FG), place soil (PS), vegetate (VE), revegetate (RV). Year is the year in which all <br />work including seeding will be done; one to two growing seasons will usually be required <br />before eligible for release. <br />C&J Gravel Products Exhibits to Reclamation Amendment #004 19 April 2009 <br />OWASTELINE, INC 2008 Project 5064.2.LQ (10/27) Draft Final C&J-MoP-004
The URL can be used to link to this page
Your browser does not support the video tag.