Laserfiche WebLink
Agency or organization name: DRMS <br />Permit or other job action : TR-27 Reclamation Cost Estimate <br />Task description : Distribute 6" of topsoil over 1.44 acre pad and rough graded access road <br />HOURLY EQUIPMENT COST <br />Basic machine : Cat D8R Series /l - 8SU (200: Horsepower : 310 <br />Blade type : Semi-Universal <br />Attachment no. 1 :ROPS Cab Shift basis : 1 per day <br />Attachment no. 2 :NA <br /> Data source : (CRG) <br /> Utilization % <br />Cost Breakdown : Ownership cost/hour : $50.32 NA <br /> Operating cost/hour : $77.13 100 <br /> Ripper op. cost/hour : $0.00 NA <br /> Operator cost/hour : $32.78 NA <br /> Total unit cost/hour : $160.22 Total fleet cost/hour : $160.22 <br /> <br />MATERIAL QUANTITIES ..... <br />Initial Swell Loose <br />volume : 1,161 LCY factor : NA volume : 1,161 LCY <br /> <br />Source of estimated volume :6" topsoil over 1.44 acres - _ <br />Source of estimated swell factor :NA <br /> <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 100 feet Material consistency : 1.20 (Cat HB) <br />Unadjusted hourly production : 852.6 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility : 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 _ <br />(1shift/day) <br />Loose stockpile Spoil pile : 0.80 (fnd-ro <br /> Push gradient : 1.00 (Cat HB)_ <br />Average push gradient : 0.00 % (neg) Altitude : 1.00 (Cat HB) <br />Average site altitude : 6,600 feet Material weight : 1.44 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 1,600 Ibs/LCY Net correction : 0.86 <br />Weight description :