Laserfiche WebLink
Agency or organization name: DRMS <br />Permit or other job action : TR-27 Reclamation Cost Estimate <br />Task description : Regrade 12H-C Well Pad <br /> <br />HOURLY EQUIPMENT COST <br /> Basic machine : Cat D8R Series 11 - 8SU (200,1 Horsepower: -- 310 <br /> Blade type : Semi-Universal <br /> Attachment no. 1 :ROPS Cab Shift basis : 1 per day_ <br /> Attachment no. 2 :NA <br /> Data source: (CRG) <br /> Utilization % - <br />Cost Breakdown : Ownership cost/hour : $50.32 NA <br /> Operating cost/hour : $77.13 100 <br /> Ripper op. cost/hour : $0.00 NA <br /> Operator cost/hour : $32.78 NA <br /> Total unit cost/hour : $160.22 Total fleet cost/hour : $160.22 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 3,000 CCY factor : 1.110 volume : 3,330 LCY <br /> <br />Source of estimated volume : Staff Estimate Based on Figure Provided by NSI <br />Source of estimated swell factor : CAT Handbook <br /> <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 100 feet Material consistency : 1.00 (Cat HB)_ <br />Unadjusted hourly production : 852.6 LCY/hr Dozing method : 1.00 _ (gen.) <br /> Visibility : 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (1shiff1day) <br />Consolidated stockpile Spoil pile : 0.80 (fnd-rf) <br /> Push gradient : 1.00 (Cat HB) <br />Average push gradient : 0.00 % (neg) Altitude : 1.00 (Cat HB) <br />Average site altitude : 6,600 feet Material weight : 0.82 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 2,800 Ibs/LCY Net correction : 0.41 <br />Weight description <br />Clay - Natural bed Adjusted unit production : 348.28 LCY/hr <br /> Adjusted fleet production : 348.28 LCY/hr <br /> <br />JOB TIME AND COST <br />Fleet size : 1 Dozer(s) Total job time : 9.56 Hours <br />Unit cost : $0.460 /LCY Total job cost : $1,532 <br />