My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-05-01_PERMIT FILE - M2009035
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2009035
>
2009-05-01_PERMIT FILE - M2009035
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:46:04 PM
Creation date
5/1/2009 2:09:35 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2009035
IBM Index Class Name
PERMIT FILE
Doc Date
5/1/2009
Doc Name
New 112c permit application
From
MA Concrete Construction
To
DRMS
Email Name
SSS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
152
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
12. Chemical treatment: Will any flocculants (settling agents or chemical additives) be used to treat water prior to discharge? <br />* (9 * Yes If YES, list here, and include the Material Safety Data Sheet (MSDS): <br />Chemical Name * Manufacturer J Purpose TI Which Waste Stream? <br />* If the chemical formula is unknown or confidential, provide the manufacturer's name, contact person, address and phone number or a copy of <br />the manufacturer's brochure, product label information or materials handling data sheet for each product used. Please list the major constituents <br />or active ingredient(s), if known. <br /> <br />13. Are the receiving waters, indicated in item 5, a ditch or storm sewer? <br />0 No (Des <br />If YES, submit documentation that the owner of the ditch or storm sewer allows this discharge. No certification will be processed unless <br />documentation of approval is received. <br />Note: A discharge permit does not allow a discharge into a ditch or municipal storm sewer system without the approval of the owner/operator of <br />that system. Please provide documentation of approval from the ditch company or owner of the storm sewer for all new discharges. <br />14. Flow measurement: What method of flow measurement will be used for each discharge point (e.g., v-notch weir, pump capacity, parshall flume, <br />etc.)? <br />T::'VMP CA?iEc tT?( <br />6
The URL can be used to link to this page
Your browser does not support the video tag.