Laserfiche WebLink
• a • <br />GENERAL REMEDIATION PLANS <br /> s <br />7WIN <br /> <br /> 1. Excavate/grade surface to finished grade. <br />olla <br />psed/Backfilled Shaft <br />< 25 feet <br />12' square opening <br />Above futished grade 2. Excavate collapsed materials to 25 feet or depth of shaft. <br /> 3. Backfrll shaft with Select Structural Fill to final Soil Liner Fill subgrade surface. <br /> 4. Compact bacldill surface. <br />ollapsedBackfdled Shaft < 25 feet 12' square opening Below finished grade <br /> 1. Drill and blast crown pillar. <br />Lateral <br />(option 1) <br />< 50 fat <br />< 12 feet wide, < 12 feet big <br />Na 2. Excavate collapsed materials to 25 feet. <br /> 3. Backfill with Coarse Shaft Backfill to within P of the final Soil Litter Fill subgrade surface. <br /> 4. Place double layer geogrid cap. <br /> 1. Drill flowable fill access holes into crown pillar. <br />Lateral (option 2) < 50 fat < 12 feet wide, < 12 feet big Na 2. Pump low compressibility, inert flowable fill material into void. <br /> 3. Final fill level to be 5' typical above lateral back. <br />Lateral > 50 > 12 feet wide, > 12 feet hi Na Treat as a scope. <br /> 1. Backfill slot with Coarse Shaft Backfrlt, Structural Fill, or Select Structural Fill to within F of <br />Mine Slot At surface < 3 feet wide Na final Soil Liner Fill subgrade surface. <br /> 2. Place double layer geogrid cap. <br />Mine Slot 1 > 3 feet wide Na Treat as a scope. <br />Much 2000 Page 2 of 2 <br />u„w,eiwnrmmm?wa.,..r "der Assoclatts 993-2099.150