My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-04-15_REVISION - M1980244 (365)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2008-04-15_REVISION - M1980244 (365)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:52:11 PM
Creation date
4/29/2009 10:02:30 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REVISION
Doc Date
4/15/2008
Doc Name
VOL V APP 8 Appendix D- Assessment of Underground Workings within Limits of Phase 5 Valley Leach
From
CC&V
To
DRMS
Type & Sequence
AM9
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
03 0 <br />GENERAL REMEDIATTON PLANS <br /> <br /> 1. Excavate/grade surface to finished grade. <br /> 2. Excavate around shaft opening forming 0.5H:1 V minimum. <br />Open Shaft or Slope > 25 feet 12' square opening Above finished grade 3. Backfill shaft with Coarse Shaft Backfill to 10 feet below final Soil Liner Fill subgrade surface. <br /> 4. Cast 3' thick concrete plug in shaft. <br /> 5. Backfill final 7 feet with Cemented Rockfill material. <br /> 6. Place Structural Fill as needed to finished grade. <br /> 1. Excavate around shaft opening forming 0.5H: IV minimum taper in overburden and rock. <br /> <br />Shaft or Slope <br />> 25 feet <br />12' square opening <br />< 7' below finished grade 2. Backfill shaft with Coarse Shaft Backfill to 10 feet below final Soil Liner Fill subgrade. <br />3. Cast 3' thick concrete plug in shaft. <br /> 4. Backfill final 7 feet with Cemented Rockfill material. <br /> 5. Place Structural Fill as needed to finished grade. <br /> 1. Excavate around shaft opening forming 0.5H:1 V miminum taper in overburden. <br /> 2. Backfill shaft with Coarse Shaft Backfill to 3 feet below overburden/rock interface <br /> <br />Open Shaft or Stope <br />> 25 feet <br />12' square opening <br />> 7' below finished grade . <br />3. Cast 3' thick concrete plug in shaft. <br /> 4. Backfill final 7 feet with Cemented Rockfill material. <br /> 5. Place Structural Fill as needed to finished grade. <br /> 1. Excavate/grade surface to finished grade. <br />Shallow Open Shaft < 25 feet 12' square opening Above <br />finished grade 2. Backfll shaft with Select Structural Fill and/or Structural Fill to final Soil Liner Fill lograde <br /> surface. <br /> 3. Compact backfill surface. <br /> 1. Backfill shaft with Select Structural Fill and/or Structural Fill to existing surface. <br />Shallow Open Shaft < 25 feet 12' square opening below finished grade 2. Compact backftll surface. <br /> 3. Finish grade with Structural Fill. <br /> 1. Excavate/grade surface to finished grade. <br /> 2. Excavate collapsed materials to 25 feet below final Soil Liner Fill subgrade surface. <br /> <br />ollapsed/Backfilled Shaft <br />> 25 feet <br />12' square opening <br />Above finished grade 2. Excavate around shaft opening forming 0.5:1 V minimum taper. <br />3. Backfill shaft with Coarse Shaft Backfill to 10 feet below final Soil Liner Fill subgrade surface. <br /> 4. Can 3' thick concrete plug in shaft. <br /> 5. Backfill final 7 feet with Cemented Rockfilt material. <br /> 6. Place Structural Fill as needed to finished grade. <br /> 1. Excavate collapsed materials m 25 feet below finished grade. <br /> 3. Excavate around shaft opening forming 0.5:1 V minimum taper in overburden and rect. <br />ollapsed/Backfilled Shaft > 25 fleet 12' square opening < 7' below, finished grade 4. Backfill shaft with Coarse Shaft Backfill to 10 feet below final Soil Liner Fill subgrade. <br /> 5. Cast 3' thick concrete plug in shaft. <br /> 6. Backfill final 7 feet with Cemented Ruckfill material <br />,.. _._. .. __ 7. Place Structural Fill as needed to finished grade. <br /> <br /> 1. Excavate collapsed materials to 25 feet below finished grade. <br /> 2. Excavate around shaft opening forming 0.51-1: IV minimum taper in overburden. <br />CollapsedBackfilled Shaft > 25 feet 12' square opening > 7' below finished grade 3. Backfill shaft with Coarse Shaft Backfill to 3 feet below overburden/soil interface. <br />' <br /> 4. Cast 3 <br />thick concrete plug in shaft. <br /> 5. Backfill final 7 feet with Cemented Rockfill material. <br /> 6. Place Structural Fill as needed to final grade. <br />March 2000 Page 1 of 2 <br />ry. m+ww?ntow,r Golder Assoelotes 993-2099.150
The URL can be used to link to this page
Your browser does not support the video tag.