My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-04-15_REVISION - M1980244 (365)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2008-04-15_REVISION - M1980244 (365)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:52:11 PM
Creation date
4/29/2009 10:02:30 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REVISION
Doc Date
4/15/2008
Doc Name
VOL V APP 8 Appendix D- Assessment of Underground Workings within Limits of Phase 5 Valley Leach
From
CC&V
To
DRMS
Type & Sequence
AM9
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
L?- I <br />• <br />C <br />APPENDIX D <br />March 2000 -19•• 993-2099.150 <br />10 feet and 80 feet below surface. Further exploratory drilling will be required to define <br />the extent and type of remediation for this area <br />This is the area of Ophir Tunnel. Other than the tunnel opening, it does not incorporate or <br />access any underground workings. The hole that was drilled in the area did not encounter <br />any underground workings. The tunnel portal will be remediated as discussed in the <br />previous sections, and further exploratory may be undertaken at the time of remediation. <br />However it is not expected that further remediation will be required in this area. <br />These are the areas of Alice, Raven Beacon, and Commonwealth Workings/Narcissus <br />Shafts, respectively. None of the holes drilled in these three areas identified any open <br />excavations. Further exploratory drilling will be undertaken in this area at the time of <br />remediation. Present evidence is that remediation will not be required in these areas. <br />6.0 CONCLUDING COMMENTS <br />The remediation program discussed above is based on a thorough assessment of the <br />information presented in the historical mining plan maps, and a limited site investigation <br />program undertaken by Golder. The main objectives were to characterize the type of <br />conditions requiring remediation, to determine the types of remediation that will be <br />required, and to indicate the approximate areas where these different types of remediation <br />will need to be implemented. These objectives have been met to the degree that the range <br />of conditions requiring remediation have been identified, and the necessary range of <br />different types of remediation activities have been developed. <br />IAM099 MAL IIEPDRrQMAPPD.DDC Golder Assockdes
The URL can be used to link to this page
Your browser does not support the video tag.