My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-04-15_REVISION - M1980244 (351)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2008-04-15_REVISION - M1980244 (351)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:52:10 PM
Creation date
4/27/2009 11:48:34 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REVISION
Doc Date
4/15/2008
Doc Name
Teller County Vol. 1, Attachment 4, 8.6 to 14.0
From
CC&V
To
DRMS
Type & Sequence
AM9
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• A map depicting the various physical boundaries of the facilities outlined above is <br />included with the reclamation cost estimate. The reclamation summary table addresses <br />each of the facilities and related cost items. The cost summary table, back-up tables, and <br />the most important engineering calculations and assumptions to develop the cost <br />information are part of a spreadsheet model developed for CC&V by Ellis Environmental <br />Engineering, Inc. (Ellis). It should be noted that acreages depicted for the various <br />facilities may not match the table of "Operating Disturbance Areas" provided elsewhere <br />due to the following reasons: (1) the reclamation cost estimate takes a "holistic" view of <br />the boundaries between facilities where the final reclamation demarcation lines are not <br />definite but rather blend from one area to another and (2) reclamation grading, slope <br />reduction, and contouring oftentimes results in a facility encroaching outside its <br />operational footprint, resulting in a slightly larger affected area. <br />The general approach for cost estimating involved calculating the areas and volumes for a <br />particular facility using either direct measurements from ACAD drawings, constructing <br />cross-sections before and after reclamation, measuring from aerial photos using a polar <br />planimeter, or simple computations involving lengths, widths, and heights. Using the <br />volumes and areas determined as above, earthmoving and revegetation equipment were <br />• selected based on productivities developed for the specific project involved utilizing such <br />resources as the Caterpillar Performance Handbook, time study information from Ellis <br />files, and engineering judgment, where appropriate. <br />For most facilities the basic outline of reclamation involves the following sequential <br />steps: (1) grading, slope reduction, re-contouring with dozers or scrapers; (2) replacing <br />growth medium to a depth of approximately six inches; (3) preparing a seed-bed by <br />scarifying or ripping; (4) revegetating consisting of fertilizing, seeding, and mulching; <br />and (5) planting trees and shrubs on north- and east-facing slopes. Certain deviations <br />from this basic approach exist for facilities such as building footprints where only minor <br />grading and "touch-up" will be required once demolition has taken place. Other facilities, <br />such as the approximate 2H:1 V slopes of the Main Cresson backfilled areas, will require <br />special treatment-helicopter seeding due to the marginal accessibility for conventional <br />revegetation equipment. <br />CC&V is considering submitting periodic financial warranty updates to the OMLR and <br />incrementally bonding for disturbances for each year as well as the unreleased portions of <br />disturbance from previous years. This is consistent with the incremental bonding <br />approach previously utilized by CC&V and accepted by the OMLR, and consistent with <br />• Cripple Creek & Victor Gold Mining Company <br />Cresson Project Mine Life Extension <br />12-2
The URL can be used to link to this page
Your browser does not support the video tag.