Laserfiche WebLink
• 12.0 RECLAMATION COSTS <br />12.1 Introduction and Approach <br />The financial warranty calculations addressed below include the reclamation obligation <br />for the entire Cresson Project, including the activities of the MLE. Updated and current <br />reclamation costs for all aspects of the project have been provided, including any facility <br />changes to support the planned MLE. <br />Included in the cost calculation are the following facilities and related cost items. <br />¦ Main Cresson Mine Area <br />¦ East Cresson Mine Area <br />¦ North Cresson Mine Area <br />¦ SGOSA <br />¦ SGOSA Extenstion <br />¦ ECOSA <br />¦ VLF Chemical Closure <br />¦ VLF Reclamation <br />• Pads 3 & 4 <br />¦ Victor Pads <br />¦ ESP, Sediment Ponds, and Storm Water Control Basins <br />¦ Monitoring Wells and Piezometers <br />¦ Haul Roads <br />¦ Growth Medium Stockpiles <br />¦ Powerlines <br />¦ Support Buildings and Footprints <br />¦ Surface Mine Fencing <br />¦ Clean-up and Miscellaneous Areas <br />¦ Revegetation Repairs and Maintenance <br />¦ Ancillary Areas <br />¦ Viewshed Conservation Areas <br />¦ Mobilization and De-mobilization of Equipment <br />¦ Post-Reclamation Monitoring of Water and Vegetation <br />¦ Indirect Costs per OMLR Rule 6 (Public Liability, Contractor's Performance Bond, <br />Overhead and Profit, OMLR Management Fee, and Contingency). <br />• Cripple Creek & Victor Gold Mining Company <br />Cresson Project Mine Life Extension <br />12-1