My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-04-15_REVISION - M1980244 (351)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2008-04-15_REVISION - M1980244 (351)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:52:10 PM
Creation date
4/27/2009 11:48:34 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REVISION
Doc Date
4/15/2008
Doc Name
Teller County Vol. 1, Attachment 4, 8.6 to 14.0
From
CC&V
To
DRMS
Type & Sequence
AM9
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• 12.0 RECLAMATION COSTS <br />12.1 Introduction and Approach <br />The financial warranty calculations addressed below include the reclamation obligation <br />for the entire Cresson Project, including the activities of the MLE. Updated and current <br />reclamation costs for all aspects of the project have been provided, including any facility <br />changes to support the planned MLE. <br />Included in the cost calculation are the following facilities and related cost items. <br />¦ Main Cresson Mine Area <br />¦ East Cresson Mine Area <br />¦ North Cresson Mine Area <br />¦ SGOSA <br />¦ SGOSA Extenstion <br />¦ ECOSA <br />¦ VLF Chemical Closure <br />¦ VLF Reclamation <br />• Pads 3 & 4 <br />¦ Victor Pads <br />¦ ESP, Sediment Ponds, and Storm Water Control Basins <br />¦ Monitoring Wells and Piezometers <br />¦ Haul Roads <br />¦ Growth Medium Stockpiles <br />¦ Powerlines <br />¦ Support Buildings and Footprints <br />¦ Surface Mine Fencing <br />¦ Clean-up and Miscellaneous Areas <br />¦ Revegetation Repairs and Maintenance <br />¦ Ancillary Areas <br />¦ Viewshed Conservation Areas <br />¦ Mobilization and De-mobilization of Equipment <br />¦ Post-Reclamation Monitoring of Water and Vegetation <br />¦ Indirect Costs per OMLR Rule 6 (Public Liability, Contractor's Performance Bond, <br />Overhead and Profit, OMLR Management Fee, and Contingency). <br />• Cripple Creek & Victor Gold Mining Company <br />Cresson Project Mine Life Extension <br />12-1
The URL can be used to link to this page
Your browser does not support the video tag.