Laserfiche WebLink
• 8.0 SUPPORT FACILITIES <br />Existing; support facilities are mapped on Drawing C-2 and proposed facilities are shown <br />on Drawing C-3. <br />8.1 Ironclad Office Facility <br />No changes to the Ironclad Office Facility are proposed. For informational purposes, the <br />Ironclad Office Facility includes the Security Office including entrance station and guard <br />shack, Engineering Office, Ironclad Maintenance Facility, a truck shop, a small vehicle <br />shop, a tire pad, warehouse, and an employee parking lot. The Bulk Emulsion facility is <br />located here as well as the Explosives Magazines. Dimensions for these facilities may be <br />found in the financial warranty calculations, in Appendix 2. <br />8.2 :Maintenance Facility <br />No changes to the Maintenance Facility are proposed. The existing maintenance and <br />truck wash facilities known as the Ironclad Facilities (Drawing C-2) will continue to <br />serve the operations proposed under the MLE for some period into the future. Used <br />liquids, such as oil and antifreeze that may escape during maintenance or may be washed <br />• off during washing activities, are collected in a floor drain system within the facility. The <br />floor drain is routed to an oil-water separator to allow separation of used liquids from the <br />water before reuse of the water. The used liquids will be collected for proper recycling or <br />disposal. <br />The equipment ready line is located to the vicinity of the Ironclad Facilities as shown on <br />Drawing; C-2. <br />The fuel farm is located in the vicinity of the Crushing and Conveyor Facility as shown <br />on Drawing C-2. The fuel farm provides lined containment for 110 percent of the largest <br />tank volume. <br />8.3 Crushing and Conveyor Facility <br />The Crushing and Conveyor Facility has previously been discussed under Section 5.6 of <br />the Mine Plan. The area includes a Lime Silo, a water tank, and a fuel farm, in addition to <br />the primary and secondary crushers, screening station, and the LOB. The existing crusher <br />maintenance building will be demolished and a new building will be constructed in the <br />same general area, with a slightly relocation as shown on Drawing C-3. <br />• Cripple Creek & Victor Gold Mining Company <br />Cresson Project Mine Life Extension <br />S-1