My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-04-15_REVISION - M1980244 (309)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2008-04-15_REVISION - M1980244 (309)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:52:10 PM
Creation date
4/27/2009 11:46:54 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REVISION
Doc Date
4/15/2008
Doc Name
Teller County Vol.1, Attachment 4, 1.0 to 8.5
From
CC&V
To
DRMS
Type & Sequence
AM9
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />Growth medium will be used to create visual and acoustic barriers at the permit <br />boundary adjacent to the Schist Island portion of the North Cresson Mine area and <br />the Phase 5 VLF extension similar to those completed for development of the <br />ECME area of the East Cresson Mine and South Cresson portion of the Main <br />Cresson Mine area under Amendment No. 8. The visual and acoustic barrier will <br />be constructed at a height not to exceed approximately 30 feet or as needed and <br />will lie along the permit boundary as shown on Drawing C-4b. This soil will then <br />be used for final reclamation once the mining and overburden placement is <br />complete in the North Cresson Mine Area and rinsing completed on the VLF. <br />Growth medium will be stockpiled to depths and slopes appropriate for 1) access <br />for placement and removal, 2) erosional stability, and 3) minimization of the <br />footprint to limit additional disturbed area. Growth medium stockpiles, when in <br />place for more than one year, with no further disturbance planned, will be seeded <br />with the same or a similar seed mix approved by OMLR for use in revegetation at <br />the time (see Section 11.3.3). The seed mix may emphasize annuals if the <br />stockpile is anticipated to be moved within approximately two years. <br />• If necessary erosion control structures, run-on diversion ditches or equivalent <br />structures designed for the 10-year, 24-hour precipitation event will be <br />constructed upgradient of growth medium stockpiles for protection. A more <br />complete discussion of runoff and sediment control is contained in Section 9.0 of <br />this Project Description. <br />5.4.3 Mining Areas, Operations and Equipment <br />The MLE includes construction of Phase 5 of the VLF, the extension of the <br />SGOSA Extension, and the addition of the ECOSA. An additional approximate <br />110 tons of ore and 250 tons of overburden will be mined as part of the MLE. <br />Mining and backfilling will continue in the previously approved areas, <br />predominantly in the Main Cresson Mine area, North Cresson Mine area, and East <br />Cresson Mine area. Each mine area is shown on Drawing C-4 to the planned <br />depth. Generalized cross sections of the mine areas are included as Drawing C-6 <br />which shows the depths of mining and the extent of backfilling. <br />Mining will continue to utilize conventional surface mining excavation methods <br />as they presently occur. The overburden and ore will be mined using conventional <br />• Cripple Creek & Victor Gold Mining Company <br />Cresson Project Mine Life Extension <br />5-8
The URL can be used to link to this page
Your browser does not support the video tag.