Laserfiche WebLink
ROADABLE EQUIPMENT sheet 2 of 2 <br />Machine <br />Description Total <br />Cost/houdunit Fleet Size <br />(No. units) Haul Trip <br />Cost/hr/fleet Return Trip <br />Cost/hr/fleet <br />-GENERIC 3.9 in. - 3,100 ft. capy. $73.30 1 $73.30 $73.30 <br />-Fuel Tanker, 4x2, 170 HP $63.62 1 $63.62 $63.62 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotals : $136.91 $136.91 <br />EQUIPMENT HAUL DISTANCE and TIME <br /> Nearest major city or town within project area region : Grand Junction <br />Transportation Cycle Time : Non- Total one-way travel distance : 120.0 miles <br /> Roadable Roadable Average travel speed : 45.0 mph <br /> Equipment Equipment <br />Haul time (hours) = 2.67 2.67 Total non-roadable mob/demob cost $8,592.04 <br />Return time (hours) = 2.67 2.67 * two round trips with haul rig <br />Loading time (hours) = 2.00 NA Total roadable mob/demob cost ** : $730.21 _ <br />Unloading time (hours) = 1.00 NA ?• one round trip, no haul rig <br />Subtotals = 8.33 5.33 <br />JOB TIME AND COST Total job time : 16.67 hours <br /> Total job cost : $9,322