Laserfiche WebLink
CIRCES Cost Estimating Software <br />EQUIPMENT MOBILIZATION / DEMOBILIZATION <br />PROJECT IDENTIFICATION sheet 1 of 2 <br />Agency or organization name : CDRMS <br />Task # : 014 State : Colorado Permitijob # : C-1981-033 <br />Date : 0411712009 County : Gunnison Abbreviation :none <br />User : SLB Site :Bear No. 3 Filename :C033-014 <br />Permit or other job action :Phase I Bond Release <br />Task description : Haul equipment for initial reclamation <br />EQUIPMENT TRANSPORT RIG COST Shift basis : 1 per day <br /> Cost data source : CRG Data <br />Truck tractor description : Generic on-highway truck tractor, 6x4, diesel powered, 400 HP (2nd half, 200 <br />Truck trailer description :Generic folding gooseneck, drop deck equipment trailer (25T, 50T, and 1007) <br />Available rig capacities : 0-25 Tons 26-50 Tons 51+ Tons <br /> <br />Cost Breakdown : Ownership cost/hour : <br />$16.63 $18.37 _ <br />$22.33 <br /> _ <br />Operating cost/hour : $44.38 $46.13 $50.07 <br /> <br />Operator cost/hour : <br />$27.66 <br />$27.66 _ <br />$27.66 <br /> <br />Helper cost/hour:, <br />$0.00 <br />$25.39 _ <br />$25.39 <br /> <br />Total Unit Cost/hour : <br />$88.67 <br />$117.55 _ <br />$125.45 <br />NON-ROADABLE EQUIPMENT <br />Machine <br />Description Weight/unit <br />(Tons) Ownership <br />Cost/hr/unit Haul Rig <br />Cost/hr/unit Fleet Size <br />(No. units) Haul Trip <br />Cost/hr/fleet Return Trip <br />Cost/hr/fleet DOT permit <br />Cost/fleet <br />-Cat D3G XL - 3P 9.81 $11.29 $88.67 1 $99.96 $88.67 $0.00 <br />-Cat D7R DS Series 11 - 7SU 35.17 $41.70 $117.55 1 $159.25 $117.55 $0.00 <br />-Cat 325C L 31.07 $38.60 $117.55 1 $156.15 $117.55 $0.00 <br />-Revegetation equipment 20.00 $60.00 $88.67 1 $148.67 $88.67 $0.00 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotals : $564.03 $412.44 $0.00