Laserfiche WebLink
STATE OF COLORADO <br />DIVISION OF RECLAMATION, MINING AND SAFETY <br />Department of Natural Resources <br />1313 Sherman St., Room 215 <br />Denver, Colorado 80203 <br />Phone: (303) 866.3567 <br />FAX: (303) 832-8106 <br />DATE: April 10, 2009 <br />TO: Russ Means <br />FROM: Allen Sorenson _ <br />RE: Review of Storm Water Controls, Nuvemco, LLC, Monogram Mines, <br />Permit Conversion CN-01, Permit No. M-1978-222-UG <br />COLORADO <br />DIVISION OF <br />RECLAMATION <br />MINING <br />SAFETY <br />Bill Ritter, Jr. <br />Governor <br />Harris D. Sherman <br />Executive Director <br />Ronald W. Cattany <br />Division Director <br />Natural Resource Trustee <br />The following items remain to be addressed relative to proposed storm water controls pertaining to the above <br />referenced application. <br />The Division concurs with the selection of the design storm events as the basis for storm water controls for the <br />mine staging area, but has determined that the design basis for the ore storage area must be increased to the 100 <br />year/24 hour plus the 10 year/24 hour precipitation. The discussion of containment for runoff from the ore storage <br />area indicates that a decision has not yet been made on whether to install a lined pond or a pre-fabricated vessel. <br />In either case, no designs or specifications for lining or vessel construction have been provided. The Operator may <br />either decide now on the type of containment to be used, and submit designs and specifications for review, may <br />submit designs and specifications for both options, or may defer the submittals to later. If the submittals are <br />deferred, then the designs and specificati ons must be <br />allowed until the technical revision hs approved revision to the permit, and <br />storage of ore at the surface would not be <br />The detention pond for runoff from the staging area is designed with 1:1 side slopes. The Division will require that <br />the pond designs be redone with side slopes no steeper than 2:1. The designs for this pond indicate that the outfall <br />will be fenced for wildlife protection; it must be clarified that the entire pond will be fenced, and the fencing to be <br />installed must be described. There is no design provided forth rip rap sou ndneass criteria. and its basis must be <br />provided to include dimensions, rip rap sizing and Rule 6.4.20(10) requires that certain storm water controls for this type of mining operation be described through <br />design specifications certified by a licensed professional engineer. The design specifications when re-submitted <br />considering the above listed issues, must be re-certified by an engineer licensed to practice in Colorado. <br />c:\acs files\My Documents 4-19-06\monogram cn 1 sw review.doc <br />Office of <br />Ar1i?m -mi In.rlivc Minoc <br />office of non.,cr . (:rand 11-rtinn . niiranon <br />U;-4 1 and Ra..l?m?f:nn