Laserfiche WebLink
User <br />KAP <br />Site :Ghost River Filename : M002-002 <br />Agency or organization name : Colorado Division Of Reclamation Mining And Safety <br />Permit or other job action : Bond recalculation related to inspection <br />Task description :Grade topsoil <br />..... .......... <br />HOURLY EQUIPMENT COST <br />Basic machine : Cat D8R Series 11 - 8SU (200; Horsepower : 310 <br />Blade type : Semi-Universal <br />Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br />Attachment no. 2 :3-shank ripper <br /> Data source : (CRG) <br /> Utilization % <br />Cost Breakdown : Ownership cost/hour : $57.13 NA <br /> Operating cost/hour : $77.13 100 <br /> Ripper op. cost/hour : $0.00 0 <br /> Operator cost/hour : $32.78 NA <br /> Total unit cost/hour : $167.03 Total fleet cost/hour : $167.03 <br />..... <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 3,500 CCY factor : 1.125 volume : 3,938 LCY <br /> <br />Source of estimated volume : Reclamation plan <br />Source of estimated swell factor : NA <br /> <br />.. ....... <br /> <br />HOURLY PRODUCTION .... ... - .:............:: . .........: ....... <br />..... <br />Job Condition Correction Factors <br /> <br />Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 50 feet Material consistency : 1.10 (Cat HB) <br />Unadjusted hourly production : 1,400.0 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility : 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (1shifh/day) <br />Partly consolidated stockpile Spoil pile: 0.80 (fnd-d) <br /> Push gradient : 1.60 (Cat HB) <br />Average push gradient : 30.00 % (neg) Altitude : 1.00 (Cat HB) <br />Average site altitude : 5,675 feet Material weight : 0.90 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 2,550 Ibs/LCY Net correction : 0.79 <br />Weight description <br />Earth - Dry packed Adjusted unit production : 1107.26 LCY/hr <br /> Adjusted fleet production : 1,107.26 LCY/hr <br /> <br />, <br />JOB TIME AND COST , . <br />Fleet size : 1 Dozer(s) Total job time : 3.56 Hours <br />Unit cost : $0.151 /LCY Total job cost : $594 <br />