Laserfiche WebLink
CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Task #: 001 <br />Date : 0212612009 <br />User : KAP <br />Agency or organization name : Colorado Division Of Reclamation Mining And Safety <br />Permit or other job action :Bond recalculation related to inspection <br />Task description : Replace overburden <br />HOURLY EQUIPMENT COST <br />volume : 3,500 LCY <br />factor : NA volume : 3,500 LCY <br />Source of estimated volume : Reclamation plan <br />Source of estimated swell factor :NA <br /> <br />>::..;. .:. <br />HOURLY PRODUCTION <br />Job Condition Correction Factors . <br />Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 150 feet Material consistency : 1.20 (Cat HB) <br />Unadjusted hourly production : 634.3 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility : 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (1shift1day) <br />Loose stockpile Spoil pile : 0.80 (fnd-rt) <br /> Push gradient : 1.00 (Cat HB) <br />Average push gradient : 0.00 % (pos) Altitude : 1.00 (Cat HB) <br />Average site altitude : 5,675 feet Material weight : 0.70 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 3,300 Ibs/LCY Net correction : 0.42 <br />Weight description : <br />Decomposed rock - 75% Rock, 25% Earth <br />Adjusted unit production <br />Adjusted fleet production <br />264.10 <br />264.10 <br />LCY/hr <br />LCY/hr <br />JOB TIME AND COST <br />Fleet size : 1 Dozer(s) Total job time : 13.25 Hours <br />Unit cost : $0.632 /LCY Total job cost : $2,214 <br />State : Colorado <br />County :Huerfano <br />Site : Ghost River <br />Basic machine : Cat D8R Series'll - 8SU (200: Horsepower : 310 <br />Blade type : Semi-Universal <br />Attachment no. 1 :ROPS Cab Shift basis : 1 perday <br />Attachment no. 2 :3-shank ripper <br />Data source : (CRG) <br />Permit/job# M-2003-002 <br />Abbreviation : none <br />Filename : M002-001