Laserfiche WebLink
Blade type : Semi-Universal <br /> Attachment no. 1 :ROPS Cab Shiftbasis : 1 perday <br /> Attachment no. 2: 3-shank ripper <br /> Data source : (CRG) <br /> Utilization % <br />Cost Breakdown : Ownership cost/hour : $48.36 NA <br /> Operating cost/hour : $56.19 100 <br /> Ripper op. cost/hour : $0.00 0 <br /> Operator cost/hour : $32.78 NA <br /> Total unit cost/hour : $137.33 Total fleet cost/hour : $137.33 <br /> <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 1,029 LCY factor : NA volume : 1,029 LCY <br /> <br />Source of estimated volume: Backfill bolumes on tasks 3 & 4 <br />Source of estimated swell factor :NA <br /> <br />. <br />HOURLY PRODUCTION ......:. <br />Job Condition Correction Factors <br />Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 100 feet Material consistency : 1.10 (Cat HB) <br />Unadjusted hourly production : 714.3 LCY/hr Dozing method : 1.10 (50% sl) <br /> Visibility : 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (1shift/day) <br />Partly consolidated stockpile Spoil pile : 0.80 (fnd-ri) <br /> Push gradient : 1.00 (Cat HB) <br />Average push gradient : 0.00 % (neg) Altitude : 0.93 (Cat HB) <br />Average site altitude : 8,000 feet Material weight : 0.70 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 3,300 lbs/LCY Net correction : 0.39 <br />Weight description : <br />Decomposed rock - 75% Rock, 25% Earth. Adjusted unit production : 278.59 LCY/hr <br /> Adjusted fleet production : 278.59 LCY/hr <br /> <br />JOB TIME AND COST <br />Fleet size : 1 Dozer(s) Total job time : 3.69 Hours <br />Unit cost : $0.493 /LCY Total job cost : $507 <br />