Laserfiche WebLink
CIRCES Cost Estimating Software <br />HYDRAULIC EXCAVATOR WORK <br />PROJECT IDENTIFICATION <br />Task #: 004 <br />Date : 0212012009 <br />User : KAP <br />State : Colorado <br />County : San Miguel <br />Site :Deep Creek Placer <br />Agency or organization name : Colorado Division Of Reclamation Mining And Safety <br />Permit or other job action :Bond Recalculation related to Inspection <br />Task description : Pull in berm at edge of operating pad, for backfill <br />HOURLY EQUIPMENT COST <br />volume : 150 CCY <br />factor : ' 1.125 volume : 169 LCY <br />Source of estimated volume : Permit map <br />Source of estimated swell factor :n/a <br />HOURLY PRODUCTION <br />Excavator Cycle Time (load bucket, swing loaded, dump bucket, swing empty) <br />Basic job condition description <br />Secondary job condition within basic description <br />Cycle time value <br />Bucket Capacit <br />AVERAGE <br />AVERAGE <br />0.24 minutes <br />Rated bucket capacity : 0.40 LCY (heaped) Bucket size class : medium <br />Bucket fill factor : 0.85 Hard, tough clay (80% - 90916) <br />Adjusted bucket capacity : 0.34 LCY <br />Job Condition Correction Factors Source <br />Site altitude : 8,000 feet Altitude adjustment : 0.87 (Cat HER) <br /> Job efficiency adjustment : 0.83 (1 shift/day) <br /> Net job correction : 0.72 multiplier <br />Permit/job #:M-1986-102 <br />Abbreviation :none <br />Filename : M102-004