My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-10-07_REVISION - M1985115
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1985115
>
2008-10-07_REVISION - M1985115
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 11:44:24 AM
Creation date
4/20/2009 3:33:57 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1985115
IBM Index Class Name
REVISION
Doc Date
10/7/2008
Doc Name
Cost summary form
From
DRMS
To
Greer Pit
Type & Sequence
SI2
Email Name
KAP
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Basic machine : Cat D8R Series 11- 8SU (200: Horsepower : 310 <br />Blade type : Semi-Universal <br />Attachment no. 1 :ROPS Cab Shiftbasis : 1 perday <br />Attachment no. 2:3-shank ripper <br /> Data source: <br />(CRG) <br /> - <br />Utilization % <br />Cost Breakdown : Ownership cost/hour : $57.13 NA <br />Operating cost/hour : $77.13 100 <br />Ripper op. cost/hour : $0.00 0 <br />Operator cost/hour : $32.78 NA <br />Total unit cost/hour : $167.03 Total fleet cost/hour : $167.03 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 917 LCY <br />factor : NA volume <br />917 LCY <br />Source of estimated volume : approved plan in TR-02 <br />Source of estimated swell factor :NA <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 75 feet Material consistency : 1.20 (Cat HB) <br />Unadjusted hourly production : 1,017.1 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility : 1.00 (a vg.) <br />Material consistency description : Job efficiency : 0.83 (1shift/day) <br />Loose stockpile Spoil pile : 0.80 (fnd-r!) <br /> Push gradient : 1.60 (Cat HB) <br />Average push gradient : 30.00 % (neg) Altitude : 1.00 (Cat HB) <br />Average site altitude : 6,600 feet Material weight : 1.10 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 2,100 Ibs/LCY Net correction : 1.05 <br />Weight description <br />Earth - Loam <br />Adjusted unit production <br />Adjusted fleet production <br />1065.61 <br />1,065.61 <br />LCY/hr <br />LCY/hr <br />JOB TIME AND COST <br />Fleet size : 1 Dozer(s) Total job time : 0.86 Hours <br />Unit cost : $0.157 /LCY Total job cost : $144 <br />X :X:
The URL can be used to link to this page
Your browser does not support the video tag.