My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-10-07_REVISION - M1985115
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1985115
>
2008-10-07_REVISION - M1985115
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 11:44:24 AM
Creation date
4/20/2009 3:33:57 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1985115
IBM Index Class Name
REVISION
Doc Date
10/7/2008
Doc Name
Cost summary form
From
DRMS
To
Greer Pit
Type & Sequence
SI2
Email Name
KAP
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Agency or organization name : Colorado Division Of Reclamation Mining And Safety <br />Permit or other job action :Bond Recalculation related to Inspection <br />Task description : Regrade Pit Floor <br />_ :. <br />HOURLY EQUIPMENT COST <br />Basic machine : Cat D8R Series 11 - 8SU (200,1 Horsepower : 310 <br />Blade type : Semi-Universal <br />Attachment no. 1 : ROPS Cab Shiftbasis : 1 per day <br />Attachment no. 2 :3-shank ripper <br />volume : 3,581 LCY factor : NA volume : 3,581 LCY <br />Source of estimated volume : approved plan in TR-02 <br />Source of estimated swell factor : NA <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 55 feet Material consistency : 0.80 (Cat HB) <br />Unadjusted hourly production : 1,323.4 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility : 1.00 (avg.) <br />Material consistency description <br />Dry, non-cohesive <br />Average push gradient : 0.00 % <br />Average site altitude : 6,600 feet <br />Material weight : 3,250 Ibs/LCY <br />Weight description <br />Gravel - Pitrun <br />Job efficiency : 0.83 (1shif <br />Spoil pile : 0.80 (fnc <br />Push gradient : 1.00 (Cat <br />Altitude : 1.00 (Cat <br />Material weight : 0.71 (Cat <br />Blade type : 1.00 (S/S <br />Net correction : 0.28 <br />Adjusted unit production : 372.59 LCY/hr <br />Adjusted fleet production : 372.59 LCY/hr <br />HB) <br />JOB TIME AND COST <br />Fleet size : 1 Dozer(s) Total job time : 9.61 Hours <br />Unit cost : $0.448 /LCY Total job cost : $1,605
The URL can be used to link to this page
Your browser does not support the video tag.