My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-04-15_REVISION - C1982056
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1982056
>
2009-04-15_REVISION - C1982056
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:45:36 PM
Creation date
4/16/2009 10:47:47 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056
IBM Index Class Name
REVISION
Doc Date
4/15/2009
Doc Name
Adequacy Responses (Memo)
From
Janet Binns
To
Kent Gorham
Type & Sequence
TR66
Email Name
KAG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Peabodq <br />Twentymile Coal <br />April 13, 2009 <br />Mrs. Janet Binns <br />Environmental Protection Specialist <br />Division of Minerals and Geology <br />1313 Sherman Street, Room 215 <br />Denver, Colorado 80203 <br />(303) 866-4944 <br />29515 Routt County Road 27 <br />Oak Creek, CO 80467 <br />970.879.3800 <br />RE: Foidel Creek Mine (Permit No. C-82-056) - Technical Revision TR09-66, 18-Left <br />Ventilation Shaft Installation Technical Adequacy Responses <br />Dear Mrs. Binns: <br />With this submittal, Twentymile Coal Company (TCC) is responding to the specific comments <br />presented in your Technical Adequacy comment letter of March 27, 2009. Our accompanying <br />responses are presented in a Comment/Response format to facilitate your review. Also included in this <br />response submittal are two copies of all PAP text, and supporting materials that have been revised or <br />added in response to your comments, and as noted in our corresponding responses. New or revised <br />materials provided for insertion/replacement are identified, and placement instructions provided, by the <br />attached Summary of Revisions/Additions. The only item currently pending is a follow-up <br />consultation letter from the CDOW, reflecting field review of the site by the CDOW grouse specialist, <br />and elimination of the seasonal timing restrictions noted in the original CDOW letter. A copy of that <br />letter will be forwarded to you on receipt. <br />We appreciate your timely review of this response submittal package and look forward to approval of <br />the pending Technical Revision application. Thanks for your continuing cooperation and assistance. <br />Please feel free to contact me with any questions regarding this submittal or related matters. <br />Best regards, <br />Twentymile Coal Company <br />Jerry M. Nettleton <br />Environmental Manager <br />cc: Mike Berdine/TCC
The URL can be used to link to this page
Your browser does not support the video tag.