My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-04-13_REPORT - M1980244 (3)
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2009-04-13_REPORT - M1980244 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:45:30 PM
Creation date
4/15/2009 2:15:26 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
4/13/2009
Doc Name
Weekly Construction Quality Assurance ("CQA") Reports- 3/29/09
From
CC&V
To
DRMS
Email Name
BMK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AIV% <br />amec <br />Earth 8 Environmental <br />C. Overburden Rock to Stockpile <br />1. LOB Pad <br />Earlier in the week, a Komatsu 800 excavator was used in the LOB Pad area for <br />removal of all shot rock for transport to the Joe Dandy Main Cresson backfill. <br />Transport to the stockpile using four Volvo haul trucks. All overburden rock has <br />now been removed to the Joe Dandy Main Cresson backfill. <br />2. LOB Delivery Road <br />Overburden shot rock this past week from Stations 28+00 (+/-) to 26+00(+/-) and <br />Stations 16+00(+/-) to 13+00(+/-) has been transported to the Joe Dandy stockpile <br />using 4 Cat 777 Haul Trucks, a Komatsu 800 excavator, and a CAT 875 track <br />excavator aided by a Cat D-10 dozer. (Double shift work) <br />Rockbreakers has continued drilling the LOB Delivery Road cut between Stations <br />2+00 (+/-) to 4+00 (+/-) and stations 33+00(+/-) to 30+00(+/-) for blasting. <br />Blasting was performed in the aforementioned area this past Monday and Friday. <br />Rockbreakers has been working double shifts, weather permitting. <br />3. LOB Conveyor Corridor <br />No overburden rock transported to the Joe Dandy Main Cresson backfill. <br />D. Cut to Fill <br />1. LOB Pad <br />No work performed during the week. <br />2. LOB Delivery Road <br />No work performed during the week. <br />3. LOB Conveyor Corridor <br />Fill was placed at transfer station 4 this week and work was completed in the <br />gravity take up tower, approximate Station 1+00 of conveyor corridor 1. <br />E. Subgrade Preparation <br />1. LOB Pad <br />No work performed during the week. <br />F. SLF Processing (Material is being generated/processed for the LOB and the VLF) <br />The SLF clay plant, located in SGOSA (Squaw Gulch Overburden Storage Area) <br />Dump 5 is in the process of being dismantled. A new plant is due to arrive. <br />Summary of SLF processing <br />Location This Week Cumulative Comments <br /> (tons) (tons) <br />Processing Dump Dump 5 Clay 0 T 23,600 New plant due to arrive <br />Totals 0 23,600 No Change this week. <br />G. Miscellaneous <br />None <br />Sheet 2 of 11 <br />LOB Weekly Report WE 04.04.09.D
The URL can be used to link to this page
Your browser does not support the video tag.