My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-04-13_REPORT - M1980244 (3)
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2009-04-13_REPORT - M1980244 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:45:30 PM
Creation date
4/15/2009 2:15:26 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
4/13/2009
Doc Name
Weekly Construction Quality Assurance ("CQA") Reports- 3/29/09
From
CC&V
To
DRMS
Email Name
BMK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
,ameO <br />Earth & Environmental <br />SLF processing located in SGOSA Dump 5 has not operated all week. A new plant is due to arrive. <br />The materials processing plant located in AGOSA has been in limited production during the week. <br />Work has continued on the 9775 bench widening for the relocation of the existing solution piping. This <br />work is advancing to the north and appears to be nearing completion. <br />Testing Summary <br />Laboratory testing continues (Gradations, Atterberg Limit, and Moisture-Density Relationships) for <br />previously sampled materials, throughout the shift. Permeability testing continues at an off-site <br />laboratory. A sample of clay for testing was obtained from the South Cresson stockpile. (SLF-21-C). <br />Testing is in progress. Permeability test results are meeting or exceeding the requirements as per the <br />project documents. <br />GENERAL PROJECT ITEMS <br />Summary of Concerns: <br />No Concerns <br />Summary of Non-conformances: <br />None Issued <br />Summary of Meetings and Discussions: <br />CC& V.• <br />CC&V held a Weekly Contractors' meeting on March 31, 2009. Items discussed included Safety, <br />Environmental, Schedule, QC documentation, and CQA. <br />Ames Construction: <br />Daily safety meetings are performed prior to each shift. These have been used to discuss work areas, <br />procedures, testing requirements, etc with the Ames supervisors and equipment operators. . <br />AMEC and Ames discussed daily work activities during the week and procedures for fill placement. The <br />daily safety meetings are now being conducted in the VLF lay down area. <br />AMEC: <br />Derek W, Project Manager - General project status. John Lupo was on site this past week to review the <br />work progress. <br />Others: None <br />Summary of Incidents/Accidents/Health & Safety Issues <br />None noted. <br />We trust the information provided clearly represents our findings and observations for the week ending <br />April 4, 2009. <br />Date: April 4, 2009 <br />Stephen G. Rice, CQA Monitor <br />Approved By: Date: <br />Sheet 4 of 6 VLF Weekly Report WE 04.04.09.D
The URL can be used to link to this page
Your browser does not support the video tag.