My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-04-13_REPORT - M1980244 (3)
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2009-04-13_REPORT - M1980244 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:45:30 PM
Creation date
4/15/2009 2:15:26 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
4/13/2009
Doc Name
Weekly Construction Quality Assurance ("CQA") Reports- 3/29/09
From
CC&V
To
DRMS
Email Name
BMK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ad% <br />amec <br />Earth & Environmental <br />VLF EARTHWORKS FIELD MONITORING SUMMARY (WEEKLY REPORT) <br />Project Title: CC&V/ Phase 5 <br />Owner: Cripple Creek & Victor Gold Mining Co <br />Location: Cripple Creek & Victor Gold Mine <br />Work Element: Phase 5 CQA/ VLF <br />Date: April 4, 2009 <br />Project No.: 8420125EO <br />Contractor: Ames Construction Co., Inc. <br />Shift: Day/Night <br />Reporting Period: 03/29/09 through 04/04/09 <br />Days S MI T W T F S <br />Work Shifts - D D D D D - <br /> - N N N N N - <br />D = Day Shift N = Night Shift <br />Ambient Temperature Range (F): Low: -5°F to26°F (+/-) High: 18° F to 40°F <br />In general, weather during the week was cold, partly cloudy to cloudy with periods of snow, and wind <br />namely during night shift work. Saturday work was cancelled due to blizzard conditions making <br />conditions dangerous due to ice and snow on the haul roads. <br />AMEC; CQA: Personnel On-site through the Reporting Period (See Attachment A). <br />AMES, Delays due to weather during night shift snows. Saturday work cancelled due to blizzard <br />conditions. <br />CONSTRUCTION ACTIVITIES and PROGRESS: <br />1. EARTHWORKS <br />A. Clear and Grubbing <br />1. VLF <br />Ames continued clearing and grubbing activities below the East Perimeter Access <br />Road. Pioneer roads were used for access. Ames used one to two CAT 345 track <br />excavators to consolidate grubbed material, for loading. Work has advanced down <br />slope to from stations A8+00 (+/-) to A4+00 (+/-) and E20+00 (+/-) to E14+00 (+/-). <br />Ames used one Volvo A40D haul truck to transport the material to Pad 4 slash pile <br />located North of Ames maintenance facility. <br />Sediment Collection Pond: <br />Clearing and grubbing has been completed. <br />B. Stripping <br />1. VLF <br />No work this past week. <br />Sheet I of 6 <br />VLF Weekly Report WE 04.04.09.1)
The URL can be used to link to this page
Your browser does not support the video tag.