Laserfiche WebLink
Ad% <br />amec <br />Earth & Environmental <br />VLF EARTHWORKS FIELD MONITORING SUMMARY (WEEKLY REPORT) <br />Project Title: CC&V/ Phase 5 <br />Owner: Cripple Creek & Victor Gold Mining Co <br />Location: Cripple Creek & Victor Gold Mine <br />Work Element: Phase 5 CQA/ VLF <br />Date: April 4, 2009 <br />Project No.: 8420125EO <br />Contractor: Ames Construction Co., Inc. <br />Shift: Day/Night <br />Reporting Period: 03/29/09 through 04/04/09 <br />Days S MI T W T F S <br />Work Shifts - D D D D D - <br /> - N N N N N - <br />D = Day Shift N = Night Shift <br />Ambient Temperature Range (F): Low: -5°F to26°F (+/-) High: 18° F to 40°F <br />In general, weather during the week was cold, partly cloudy to cloudy with periods of snow, and wind <br />namely during night shift work. Saturday work was cancelled due to blizzard conditions making <br />conditions dangerous due to ice and snow on the haul roads. <br />AMEC; CQA: Personnel On-site through the Reporting Period (See Attachment A). <br />AMES, Delays due to weather during night shift snows. Saturday work cancelled due to blizzard <br />conditions. <br />CONSTRUCTION ACTIVITIES and PROGRESS: <br />1. EARTHWORKS <br />A. Clear and Grubbing <br />1. VLF <br />Ames continued clearing and grubbing activities below the East Perimeter Access <br />Road. Pioneer roads were used for access. Ames used one to two CAT 345 track <br />excavators to consolidate grubbed material, for loading. Work has advanced down <br />slope to from stations A8+00 (+/-) to A4+00 (+/-) and E20+00 (+/-) to E14+00 (+/-). <br />Ames used one Volvo A40D haul truck to transport the material to Pad 4 slash pile <br />located North of Ames maintenance facility. <br />Sediment Collection Pond: <br />Clearing and grubbing has been completed. <br />B. Stripping <br />1. VLF <br />No work this past week. <br />Sheet I of 6 <br />VLF Weekly Report WE 04.04.09.1)