Laserfiche WebLink
M-1978-349 (Dick Casey Concrete Pit) <br />2009 Technical Revision <br />March 31, 2009 <br />Page 7 <br />operation. Note that vegetation quantities are adequate to accommodate all backfill <br />scenarios. <br />Item Amount Cost Total <br />Reseeding, Fertilizing, Mulching 34.4 acres* $ 675/acre $ 23,220 <br />Berm Removal/Backfill and Topsoil <br /> <br />Replacement <br />322,000 CY <br />$ 0.85/CY <br />$ 273,700 <br />Mobilize/Demobilize Equipment $ 5,000 $ 5,000 <br />Direct Cost $ 301,920 <br />Insurance, Performance Bond and Profit <br /> <br />(15%) <br />$ 45,288 <br />Engineering/Project Management (10%) $ 30,192 <br />Total Cost $ 377,400 <br />* Reseeding costs are provided for 34.4 acres as a contingency to cover all <br />reclamation scenarios. At the time of reclamation, the Permittee will reseed only <br />those portions of the affected area not subject to permanent inundation (see Exhibit <br />E, above). <br />We look forward to working with the Division as it reviews this Technical Revision. <br />Should you need additional information, please feel free to contact me at 303-274- <br />4277, or by electronic mail to aschatz _banksandgesso.com. <br />Sincerely, <br />BANKS AND GESSO, LLC <br />ARevised Exhibit B <br />Revised Exhibit C <br />Revised Exhibit F <br />7