Laserfiche WebLink
-/ AMAOI ?.,? un?eouiT ... ... -. ... .... .. ..... ... -. .. -. .- .. sheet 2 of 2 <br />Machine <br />Description Total <br />Cost/hour/unit Fleet Size <br />(No. units) Haul Trip <br />Cost/hr/fleet Return Trip <br />Cost/hr/fleet <br />-Water Tanker, 2500 Gal. $45.01 1 $45.01 $45.01 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotals : $45.01 $45.01 <br />.. <br />EQUIPMENT HAUL DISTANCE and TIME <br /> Nearest major city or town within project area region : Brighton <br />Transportation Cycle Time : Non- Total one-way travel distance : 3.0 miles <br /> Roadable Roadable Average travel speed : 45.0 mph <br /> Equipment Equipment <br />Haul time (hours) = 0.07 0.07 Total non-roadable mob/demob cost $5,104.61 <br />Return time (hours) = 0.07 0.07 ` two round trips with haul rig <br />Loading time (hours) = 1.00 NA Total roadable mob/demob cost ** : $6.00 <br />Unloading time (hours) = 0.50 NA one round trip, no haul rig <br />Subtotals = 1.63 0.13 <br /> <br />JOB TIME AND COST Total job time : 3.27 hours <br /> Total job cost : $5,111