Laserfiche WebLink
CIRCES Cost Estimating Software <br />MENT MOBILIZATION / DEMOBIL12 <br />PROJECT IDENTIFICATION <br />Agency or organization name <br />Task # : 005 State <br />Colorado Division Of Reclamation Mining And Safety <br />Colorado <br />Date : 0410112009 County :Adams <br />User : JLE Site : Stagecoach Pit <br />sheet 1 of 2 <br />Permit or other job action : Succession Of Operator <br />Task description : Mobilization and Demobilization <br />. <br />.:::::.:::..; .:.:.:....: ,.::.. . <br />EQUIPMENT TRANSPORT RIG COST Shift basis : 1 per day <br />Cost data source : CRG Data <br />Truck tractor description <br />Truck trailer description <br />Cost Breakdown : <br />NON_R0AnAR1 F F0111PMFNT <br />Generic on-highway truck tractor, 6x4, diesel powered, 400 HP (2nd half, 2006) <br />Generic folding gooseneck, drop deck equipment trailer (25T, 50T, and 100T) <br />Available rig capacities : 0-25 Tons 26-50 Tons 51+ Tons <br />Ownership cost/hour : $16.63 $18.37 $22.33 <br />Operating cost/hour : $44.38 $46.13 $50.07 <br />Operator cost/hour : $27.66 $27.66 $27.66 <br />Helper cost/hour : $0.00 $25.39 $25.39 <br />Total Unit Cost/hour : $88.67 $117.55 $125.45 <br />Machine <br />Description Weight/unit <br />(Tons) Ownership <br />Cost/hr/unit Haul Rig <br />Cost/hr/unit Fleet Size <br />(No. units) Haul Trip <br />Cost/hr/fleet Return Trip <br />Cost/hr/fleet DOT permit <br />Cost/fleet <br />-Cat D8R Series 11 - 8SU (20 52.55 $50.32 $125.45 2 $351.53 $250.90 $500.00 <br />-Cat 627G 40.90 $55.31 $117.55 2 $345.73 $235.10 $500.00 <br />-CAT 12H 14.41 $20.87 $88.67 1 $109.54 $88.67 $250.00 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotals : $806.80 $574.67 $1,250.00 <br />Permit/job #: M-1983-067 <br />Abbreviation :none <br />Filename : M067-005