Laserfiche WebLink
5. Please submit a technical revision to the permit to incorporate a weed <br />control plan in accordance with the approved reclamation plan. <br />Downdrain Repairs Following 2008 Storm Events <br />Excess spoil fill downdrain repairs have recently been completed at all of the three <br />excess spoil fills at the Lorencito Canyon Mine. <br />6. Please submit to the Division as-constructed drawings, reviewed and <br />certified by a professional engineer, as appropriate, of all downdrain <br />repairs as per the commitment in your letter of September 16, 2008 <br />regarding repair of damage caused by late summer storm events. <br />If you have any questions or concerns, please call me. <br />6LOI-? <br />PntGorham <br />Environmental Protection Specialist III