Laserfiche WebLink
Table No. 1 Updated <br />Lafarge West, Inc. <br />Combined South Platte River Substitute Water Supply Plan <br />Lagged Stream Depletions from Active South Platte Sites for November 2008 through October 2009 <br />Applegate <br />Group, inc. <br /> <br />Month Howe <br />Pit <br />=Depletions <br />M-78-052 <br />(ac-ft) ` <br />(A) Lagged <br />Tanabe Pit <br />Depletions <br />M-00-002 <br />(ac-ft) <br />B) Lagged <br />Dunes Development <br />Depletions <br />M-99-093 <br />(ac-ft) <br />(C) Mann Lakes <br />Pit <br />Depletions <br />M-82-147 <br />(ac-ft) <br />(D) Ft. Lupton <br />Pit <br />Depletions <br />M-85-088 <br />(ac-ft) <br />E) Lagged <br />Lupton Lakes <br />Depletions <br />M-04-078 <br />(acre-feet) <br />(F) Lagged <br />Stagecoach <br />Depletions <br />M-83-067 <br />(acre-feet) <br />G Total <br /> <br />Depletions <br /> <br />(ac-ft) <br />(H <br />Nov-08 1.74 0.07 0.18 1.51 1.10 11.93 0.40 16.93 <br />Dec-08 0.93 0.06 0.16 .1.68 1.01 9.95 0.39 14.17 <br />Jan-09 1.95 0.05 0".14 0.77 0.92 8.28 0:23 12.35 <br />Feb-09 2.12 0.05 0.12 0.52 0.84 6.55 0.22 10.43 <br />Mar-09 2.26 0.04 0.11 0.51 0.80 6.72 014 _ 10.68 <br />Apr-09 2.55 r 0.04 0.09 0.62 0.79 6.42 n/a 10.51 <br />May-09 2.68 0.03 0.08 0.75 0.84 6.98 - n/a : 11.36 <br />Jun-09 2.65 0.03 0.07 0.94 0.93 7.38 n/a 12.00 <br />Jul-09 2:70 0.02 0.06 1.02 1.03 8.44 n/a 13.27 ' <br />Aug-09 2.69 0.02 0.06 0.97 1.11 8.84 n/a 13.68 <br />Sep-09 2.66 0.02 0.05 0.85 1.17 8.36 n 1a ` . " 13.10 <br />Oct-09 2.36 0.04 0.42 0.69 1.17 7.91 n/a`: ".. T2.59 <br />Total _ 27.3 0.5 1.5 10.8 11.7 97.8 151.1. (A) Total lagged mining depletions which reflect real-time conditions at the Howe Pit. <br />(B) Total post lining depletions which reflect existing real-time conditions at the Tanabe Pit. Oct-09 represents Oct-09 to Dec-09 depletions. <br />(C) Total post lining depletions which reflect existing real-time conditions at the Dunes Development Site. Oct-09 represents the remainder of the depletions. . <br />(D) Total lagged mining depletions which reflect existing steady state conditions at the Mann Lakes Pit. <br />(E) Total lagged mining depletions which reflect existing steady state conditions at the Fort Lupton Pit. <br />(F) Total lagged mining depletions which reflect real-time conditions at the Lupton Lakes Pit. <br />(G) Total lagged mining depletions which reflect real-time conditions at the Stagecoach Stop Property. Lafarge sold this property to Albert Frei & Sons in Feb-09. <br />(H) Total depletions to the South Platte River from the five sites, (A)+(B)+(C)+(D)+(E)+(F)+(G) <br />Pay wEy: 5W5 <br />C tDocuments aM SettirgsUal_-l 5el gs\T-p .. y IM-ei FiI C-1e .OuWok%B2%LGU42lS h Ptatte SWSP UPDATED WATER BALANCE wM de enng W U309 August 2D08