Laserfiche WebLink
Table No. 2 Updated <br />Lafarge West, Inc. <br />Combined South Platte River Substitute Supply Plan <br />Combined South Platte River Water Balance & Replacement Requirements <br /> <br />Month Total <br />Lagged <br />Mining <br />Depletions <br />(acre-feet) <br />A <br />Dewatering <br />Lagged <br />Depletions <br />(acre-feet) <br />(13) <br />Transit <br />Losses <br /> <br />(acre-feet) <br />(C) <br />Required <br />Replacements <br /> <br />(acre-feet) <br />(D Actual <br />Requested <br />Aurora <br />Lease <br />(acre-feet) <br />(E <br />Nov-08 16.93 8:46. 1.27 26.66 26.67 <br />Dec-08 14.17 6.97 1.06 22.20 22.21 <br />Jan-09 12.35 5.91 0.91 19.17 - 19.18 <br />Feb-09i 10.43 5.05 0.77 16.25 16.26 <br />Mar-09 10.68 4.32 0.75 15.75 15.75 <br />Apr-09 10.51 3.71 0.71 14.93 14.93 <br />May-09 11.36 3.18 0.73 15.26 15.27 <br />Jun-09 12.00 2.73 0.74 15.46 15.47 <br />Jul-09 13.27 2.34 0.78 16.39 16.40 <br />Aug-09, 13.68 2.01 0.78 16.47 16.48 <br />Sep-09 13.10 1.72 0.74 15.56 15.57 <br />Oct-09 12.59 1.48 0.70 14.77 14.77 <br />Total 151.1 47.9 9.9 208.9 208.9 <br />(A) Total mining depletions from the mining sites. See Table No. 1. <br />(B) Impacts from dewatering Lupton Lakes from May-08 to Sep-08 <br />(C) Transit losses of 5% from Metro WWTP to sites, (A+B)*0.05 <br />(D) Required replacements, (A+B+C) <br />(E) Actual requested Aurora lease schedule submitted in email to Ioana dated 3/10/09 <br />Applegate <br />Group, I,c. <br />Prepared By: SWS <br />C1Documents and SettingsXidclLocal Settings\Temporary Intemet FileslContent.Outlook\82XZGU42\South Platte SWSP UPDATED WATER BALANCE with dewatedng 03 10 09 August 2008