My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-03-30_REVISION - M1981013
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1981013
>
2009-03-30_REVISION - M1981013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 11:41:19 AM
Creation date
4/7/2009 3:10:00 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1981013
IBM Index Class Name
REVISION
Doc Date
3/30/2009
Doc Name
Reclamation cost update and notice of surety increase
From
DRMS
To
Nichols Gravel Pit L.L.P.
Type & Sequence
SI1
Email Name
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
sheet 2 of 2 <br />Machine <br />Description <br />-Flatbed Truck, 42, 30K GVW Total <br />Cost/hour/unit <br />$47.55 Fleet Size <br />(No. units) <br />1 Haul Trip <br />Cost/hr/fleet <br />$47.55 Return Trip <br />Cost/hr/fleet <br />$47.55 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotals : $47.55 $47.55 <br />..... ................. <br />EQUIPMENT HAUL DISTANCE and TIME <br />Nearest major city or town within project area region <br />Transportation Cycle Time : Non- Total one-way travel distance <br />Roadable Roadable Average travel speed <br />Haul time (hours) = 0.62 0.62 <br />Return time (hours) = 0.62 0.62 <br />Loading time (hours) = 0.50 NA <br />Unloading time (hours) = 0.50 NA <br />Subtotals = 2.25 1.25 <br />Total non-roadable mob/demob cost " <br />* two round trips with haul rig <br />Total roadable mob/demob cost <br />** one round trip, no haul rig <br />JOB TIME AND COST <br />Total job time <br />Total job cost <br />..............
The URL can be used to link to this page
Your browser does not support the video tag.