Laserfiche WebLink
CIRCES Cost Estimating Software <br />MFNT MOBILIZATION / DEMOBIL12 <br />PROJECT IDENTIFICATION <br />Agency or organization name: DRMS <br />Task # : 07a State :Colorado <br />Date : 0313012009 County :Mesa <br />User : THM Site :Nichols Gravel Pit <br />sheet 1 of 2 <br />Permit/job #:M-1981-013 <br />Abbreviation :none <br />Filename :4013-07a <br />Permit or other job action :Final Reclamtion Cost Update <br />Task description :Mobilization to and from site <br /> <br />EQUIPMENT TRANSPORT RIG COST Shift basis : 1 per day <br />Cost data source : CRG Data <br />Truck tractor description :Generic on-highway truck tractor, 6x4, diesel powered, 400 HP (2nd half, 2006) <br />Truck trailer description :Generic folding gooseneck, drop deck equipment trailer (25T, 50T, and 100T) <br />Available rig capacities : 0-25 Tons 26-50 Tons 51+ Tons <br />Cost Breakdown : Ownership cost/hour : $16.63 $18.37 $22633 <br />Operating cost/ hour : $44.38 $46.13 $50.07 <br />Operator cost/ hour : $27.66 $27.66 $27.66 <br />Helper cost/hour : $0.00 $25.39 $25.39 <br />Total Unit Cost/hour : $88.67 $117.55 $125.45 <br />NUN-KUAIJAt5LC r_WU1r1V1r_1 <br />Machine <br />Description 1 I <br />Weight/unit <br />(Tons) <br />Ownership <br />Cost/hr/unit <br />Haul Rig <br />Cost/hr/unit <br />Fleet Size <br />(No. units) <br />Haul Trip <br />Cost/hr/fleet <br />Return Trip <br />Cost/hr/fleet <br />55 <br />$117 <br />DOT permit <br />Cost/fleet <br />$250 <br />00 <br />-Cat D8R Series 11 - 8SU (20 <br />-Revegetation Tractor 47.17 <br />20.00 $50.32 <br />$25.00 $117.55 <br />$88.67 1 <br />1 $167.87 <br />$113.67 . <br />$88.67 . <br />$250.00 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotals : $281.54 $206.22 $500.00