Laserfiche WebLink
ame <br />Earth & Environmental <br />ATTACHMENT A <br />2009 CQA FIELD STAFF SCHEDULE FOR AMEC PERSONNEL <br />PHASE 5 VLF AND LOB HAUL ROAD <br />Name MAR-8 MAR-9 MAR-10 MAR-11 MAR-12 MAR-13 MAR-14 <br />Garry Salisbury ST ST ST ST ST <br />Steve Marquez ST ST ST ST ST <br />Joe Hickey LS LS LS LS LS <br />Steve Rice PR PR PR PR PR <br />NOTE: Steve Marquez will be taking over the night position, starting the week of March 15th <br />LEGEND <br />PS = Project Sponsor <br />PCE = Project Certifying Engineer <br />PM = Project Manager <br />PR = Project Resident <br />LS = Lead Soils Engineer <br />LG = Lead Geosynthetics Engineer <br />ST = Soil Technician <br />LT = Laboratory Technician <br />GT = Geosynthetics Technician <br />Sheet 6 of 8 <br />VLF Weekly Report WE 03.14.09.D