My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-03-25_REPORT - M1980244 (6)
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2009-03-25_REPORT - M1980244 (6)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:44:45 PM
Creation date
3/31/2009 12:54:24 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
3/25/2009
Doc Name
Weekly Construction Quality Assurance ("CQA") Reports
From
CC&V
To
DRMS
Email Name
BMK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />ame <br />Earth 8 Environmental <br />VLF EARTHWORKS FIELD MONITORING SUMMARY (WEEKLY REPORT) <br />Project Title: CC&V/ Phase 5 <br />Owner: Cripple Creek & Victor Gold Mining Co <br />Location: Cripple Creek & Victor Gold Mine <br />Work Element: Phase 5 CQA/ VLF <br />Date: 3/14/09 <br />Project No.: 8420125EO <br />Contractor: Ames Construction Co., Inc. <br />Reporting Period: 03/08/09 through 03/14/09 <br />Days S M T W T F S <br />Work Shifts - D D D D D - <br /> - N N N N N - <br />D = Day Shift N = Night Shift <br />Ambient Temperature Range (F): Low: 9e to 18° High: 28° to 30° <br />Tuesday AM: Snow with high winds and blowing snow. Friday: Cloudy, fog, light snow. In general, <br />the remainder of the week was cool with moderate winds and mostly clear to partly cloudy. <br />AMEC CQA Personnel On-site through the Reporting Period (See Attachment A). <br />AMES, No work delays due to weather this week. <br />CONSTRUCTION ACTIVITIES and PROGRESS: <br />1. EARTHWORKS <br />A. Clear and Grubbing <br />1. VLF <br />Ames continued clearing and grubbing activities down slope from the East Perimeter <br />Access Road. Pioneer roads were used for access. Ames used one to two excavators to <br />consolidate grubbed material for loading. <br />Ames used the Volvo A40D trucks to transport the material to Pad 4 slash pile located <br />North of Ames maintenance facility. <br />Sediment Collection Pond: <br />Clearing and grubbing has been completed. <br />B. Stripping <br />1. VLF <br />No work this week. <br />Sheet 1 of 8 <br />VLF Weekly Report WE 03.14.09.1)
The URL can be used to link to this page
Your browser does not support the video tag.