Laserfiche WebLink
Reclamation Cost Estimate <br />As stated above, the reclamation cost estimate for Morton Lakes is based on limited <br />(initial) pit development. <br />1. Estimated Direct Reclamation Cost: <br />A. Backfill, Grading and Shaping Cost Estimate <br />Mining Stage Slope Backfill Topsoil Unit Cost* Total Cost <br />1 57,500 yds 27,500 yds $ 0.80/LCY $68,000.00 <br />2 <br />3 32,300 yds $ 0.80/LCY $25,840.00 <br />4 <br />5 <br />Slurry Wall Caps 5,700 yds $ 0.80/LCY $4,560.00 <br />Total Cost $98,400.00 <br />B. Revegetation Cost Estimate <br />Revegetation Activity for 53 Acres Unit Cost* Total Cost <br />Scarify Soil $77.00/Acre $4,081.00 <br />Upland Revegetation (41 acres) $135.00/Acre $5,535.00 <br />Basin Revegetation (12 acres) $1,216.00/Acre $14,592.00 <br />Drill Grass Seed $75.00/Acre $3,975.00 <br />Weed Control $15.00/Acre $795.00 <br />Total revegetation Cost $28,978.00 <br />C. Demo and Salvage <br />Activity Unit Cost* Total Cost <br />Seal 8 Monitoring Wells $294.00/Well $2,352.00 <br />Demo and Salvage Estimate $25,000.00 <br />Mob/de-mob $15,000.00 <br />Total Demo/Salvage Cost $42,352.00 <br />2