My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-03-29_REVISION - C1980004
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1980004
>
2009-03-29_REVISION - C1980004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:44:50 PM
Creation date
3/30/2009 1:14:15 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980004
IBM Index Class Name
REVISION
Doc Date
3/29/2009
Doc Name
2009 Midterm Review
From
DRMS
Type & Sequence
MT6
Email Name
JRS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />EQUIPMENT MOBILIZATION / DEMOBILIZATION <br />PROJECT IDENTIFICATION <br />Agency or organization name : Colorado Division Of Reclamation, Mining And Safety <br />Task # : 067 State : Colorado Permit/job #: C-1980-004 <br />Date : 0312912009 County : Garfield Abbreviation :none <br />User: JRS Site :Mcclane Canyon Mine Filename :6004-067 <br />Permit or other job action :2009 Midterm Review <br />Task description :Mobilize/Demobilize Equipment for Site Maintenance <br />EQUIPMENT TRANSPORT RIG COST Shift basis : 1 per day <br />Cost data source : CRG Data <br />Truck tractor description :Generic on-highway truck tractor, 6x4, diesel powered, 400 HP (2nd half, 2006) <br />Truck trailer description : Generic folding gooseneck, drop deck equipment trailer (25T, 50T, and 1007) <br />25 Tons 26-50 Tons 51+ Tons <br />Available riEM2:6ns <br />Cost Breakdown : Ownershi16.63 $18.37 $22.33 <br />Operatin44.38 $46.13 $50.07 <br />Operat$27.66 $27.66 <br />Help$0.00 $25.39 $25.39 <br />Total Unit Cost/hou$88.67 $117.55 $125.45 <br />unit <br />Machine <br />Description <br />-Cat D3G LGP - 3P Weight/unit <br />(Tons) <br />9.69 Ownership <br />Cost/hr/unit <br />$11.79 Haul Rig <br />Cost/hr/unit <br />$88.67 Fleet Size <br />(No. units) <br />10 Haul Trip <br />Cost/hr/fleet <br />$1,004.63 Return Trip <br />Cost/hr/fleet <br />$886.70 DOT permit <br />Cost/fleet <br />$0.00 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotals <br />$1,004.63 <br />$886.70 <br />$0.00 <br />sheet 1 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.