Laserfiche WebLink
ROADABLE EQUIPMENT sheet 2 of 2 <br />Machine <br />Description Total <br />Cost/hour/unit Fleet Size <br />(No. units) Haul Trip <br />Cost/hr/fleet Return Trip <br />Cost/hr/fleet <br />-Flatbed Truck, 6x4, 45K GVW $82.02 1 $82.02 $82.02 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotals : $82.02 $82.02 <br />EQUIPMENT HAUL DISTANCE and TIME <br /> Nearest m ajor city or town within project area region : Grand Junction <br />Transportation Cycle Time : Non- Total one-way travel distance : 40.0 miles <br /> Roadable Roadable Average travel speed : 45.0 mph <br /> Equipment Equipment <br />Haul time (hours) = 0.89 0.89 Total non-roadable mob/demob cost $2,365.31 <br />Return time (hours) = 0.89 0.89 * two round trips with haul rig <br />Loading time (hours) = 0.25 NA Total roadable mob/demob cost ** : $145.81 <br />Unloading time (hours) = 0.25 NA •* one round trip, no haul rig <br />Subtotals = 2.28 1.78 <br />F <br /> <br />JOB TIME AND COST , <br />Total job time : <br />4.56 hours <br /> Total job cost : $2511