Laserfiche WebLink
Pond PP-1 contained water, although no discharge was noted. PP-1 is a concrete pond and J <br /> appeared to be stable with no problems noted at the time of the inspection. <br /> Pond PP-2 contained water with no discharge noted. Embankments were stable and well vegetated <br /> with no problems noted. <br /> The fresh water lagoon contained water, although not discharging at the time of the inspection. The <br /> lagoon was snow covered and stable with no problems noted at the time of the inspection. <br /> Pond RP-1 was dry at the time of the inspection. Embankments were snow covered and stable at the <br /> time of the inspection <br /> Pond RP-2/3 contained water in the upper cells and the lower cell at the time of the inspection. No <br /> discharge was noted. The embankments appeared stable and well vegetated at the time of the <br /> inspection. <br /> Pond RP-4 contained water with no discharge at the time of the inspection. The pond embankments <br /> appeared stable. No problems were noted with the spillways at the time of the inspection. <br /> Pond RP-5a contained water with no discharge noted. The primary/emergency spillway found to be <br /> incompliance with no problems noted. The embankments were snow covered and stable. <br /> Pond RR-1 was dry at the time of the inspection. Embankments were stable with no problems noted. <br /> Primary riser and emergency spillway found to be in compliance. <br /> Pond SS-1 contained water, with no discharge at the time of the inspection. Embankments appeared <br /> stable and well vegetated with no signs of damage. <br /> Pond SS-2 was dry at the time of the inspection. No problems were noted. Embankments appeared <br /> stable with good vegetation throughout. <br /> Roadside ditches appeared to be in compliance with no problems noted. Facilities area ditches <br /> appeared to be in compliance and no problems were noted with the exception of the following: <br /> • The diversion ditch at the entrance to the CSP to the DP-1 pond will need to be cleared of <br /> debris. <br /> Explosives <br /> Deserado Mine installed a 4'X4'X4' prefabricated Type II explosives magazine with associated cap <br /> magazine at the explosive storage site. This magazine is for temporary storage of explosives, which is <br /> permitted in the Deserado permit. Deserado Mine supplied the information for the magazine to the <br /> ATF and provided a copy to the Division during the inspection. <br /> Processing Waste <br /> Refuse Pile - 2/3/4 was snow covered and well compacted and stable at the time of the inspection. <br /> Grading appeared to allow good run-off to ponds. No problems were noted. Refuse Pile - 5 appeared <br /> to be well compacted and stable. Both sites appeared to show good run-off to the ponds via the <br /> collection ditches. Coal Mine Waste was being stockpiled at RP-5a at the time of the inspection. <br /> Support Facilities <br /> Surface facilities in and around the office and maintenance facilities appeared to be in compliance. <br /> No problems were noted. <br /> The area around the rock dust tank RDH-2 was stable at the time of the inspection with no problems <br /> noted. <br /> The load out area was stable at the time of the inspection. No problems were noted. <br />